ML20197D786
| ML20197D786 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 05/25/1988 |
| From: | Nardi A WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | Rouse L NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20197D790 | List: |
| References | |
| 24362, LA-88-22, NUDOCS 8806070393 | |
| Download: ML20197D786 (5) | |
Text
74v'E' RETURN TO 496:ST c
PH57
?
e-LLIO./ 3 Q
LA 88-22 Eibouh0}-
waterReactor y RECEIVED
)
s U
p em h,
$% p 9 f
MAY 311988 ))
f IC C0 t
DIVISI0nS
~
II
" U.S. NUCLEAR RtGUJLIORY 7 conm: stoa NMSS fj/
.s Wg(g#
Q,jY W h cC
\\' 4 s
May 25, 1988 U. S. Nuclear Regulatory Commission ATTN: Mr. Leland C. Rouse, Chief Fuel Cycle Safety Branch Division of Industrial & Medical Nuclear Safety tf4SS M/S WFl 6H3 Washington, DC 20555 Gentlemen:
REF: Attached Letter Dated April 29, 1988 StN-1107, Docket 70-1151 In the above referenced letter, Westinghouse documents annual revisions to the Radiological Contingency Plan.
Them revisions are designed to improve the plan and do not dilute or reduce the plan's effectiveness.
Enclosed is Page 2.5-1 of License StN-1107, updating Section
- 2. 5, Energency Plan.
Since this revision does not dilute or reduce the effectiveness of the olan, no licensing fee is submitted.
If you have any questions, please write or telephone me at (803) 776-2610, Extension 3247.
Very truly yours,
[ft> r A. J. Nardi, Manager NES License Administration Im WP2329E:3p.1 cc:
G. D. Bidinger Enclosures 8806070393sh00 51 PDR ADOCK O PDR C
Gdd5 c
SCHEDULE OF REVISIONS Page Revision Rage Revision Number Number Number Number i
15 1.5-2 2
11 10 1.5-3 2
111 18 1.5 4 2
-iv 3
1.5-5 2
v 15 l'. 5-6 2
vi 18 1.6-1 2
vil 14 1.7-1 2
vili 12 1.7-2 2
ix 18 1.8-3 2
1.0-1 2
1.8-2 2
1.0-2 15 1.8-3 2
1.1-1 2
1.8-4 2
1.1-2 2
1.8-5 2
1.2-1 2
1.8-6 2
1.3-1 2
1.8-7 2
1.3-2 11 1.8-8 2
1.3-3 2
1.8-9 2
1.3-4 2
1.8-10 2
1.3-5 2
1.8-11 2
1.3-6 2
1.8-12 2
1.3-7 2
1.8-13 2
1.4-1 2
3.8-14 2
1.4-2 2
1.3-15 2
1.4-3 2
1.8-16 2
1.4-4 2
1.8-17 2
1.4-5 2
1.8-18 2
1.4-6 2
1.8-19 2
1.4-7 2
1.8-20 2
1.4-8 2
1.8-21 2
1.5-1 2
1.8-22 2
Docket tb. 70-1151 Initial Submittal Date:
4/30/83 Fage No.
iii License No. SR4-1107 Revision Submittal Date:
5/25/88 Revision No.
18
4 SCHEDULE OF REVISXONS Page Revision Page Revision Number Nunter Number Number 2.0-1 15 2.3-11 2
2.1-1 2
2.3-12 2
2.1-2 2
2.3-13 2
2.1-3 2
2.3-14 2
i 2.1-4 2
2.3-15 3
2.1-5 2-2.3-16 deleted 2.2-1 2
2.3-17 2
2.2-2 2
2.3-18 2
2.2-3 16 2.3-19 2
2.2-4 3
2.3-20 2
2.2-5 3
2.4-1 3
2.2-6 2
2.5-1 18 2.2-7 2
2.6-1 5
2.2-8 2
2.7-1 3
2.2-9 2
2.7-2 3
2.2-10 2
2.7-3 2
2.2-11 2
2.7-4 2
2.2-12 4
2.7-5 2
2.2-13 4
2.7-6 2
2.2-14 15 3.0-1 2
2.3-1 4
3.1-1 2
2.3-2 4
3.1-2 2
2.3-3 3
3.1-3 2
2.3-4 2
3.1-4 2
2.3-5 2
3.1-5 2
2.3-6 2
3.1-6 2
2.3-7 2
3.1-7 2
2.3-8 2
3.1 -8 2
2.3-9 2
3.1-9 2
2.3-10 3
Docket No. 70-1151 Initial Submittal Date:
4/30/83 Page No.
vi License No. SPN-1107 Revision Suomittal Date:
5/25/88 Revision No. 18
REVISION RECORD Revision Date of Number Revision Pages Revised Revision Reason 13 7/23/87 New pages 1.11-6 Added authorization for through 1.11-8.
off-site drying of calcium fluoride.
14 8/14/87 Revised page 4.5-1.
Added drying' of calcium fluoride to scope of operations.
Revised pages 4.8-1 Delete Western Zironium and 4.8-2.
as an authorized recipient of HF.
Revised page 4.1-1.
Update document date.
Revised pages 1.11-2, Added encapsulated 1.11-4, 1.11-5, and materials to briquetting 1.11-6.
desciption.
15 8/18/87 New pages 1.14-1 thru Added criteria to 1.14-5 and 2.2-14.
preclude foreign contaminants from UF6 cylinders.
1 16 1/25/88 Revised page 2.2-3.
Add interlock pressure requirement positive pressure gloveboxes.
17 2/8/88 Revised page 2.5-1.
Update of Emergency Plan Section.
18 5/25/88 Revised page 2.5-1.
Update of Emergency Plan Section.
Docket No. 70-1151 Initial Submittal Date:
7/23/87 Page No._
ix License No. SW -llO7 Revision Submittal Date:
5/25/88 Revision No.
18
2.4.2 Nonroutine and emergency operations involving SW shall be performed only after the particular operation has been approved by the appropriate line management function and the Radiation Protection Component, consistent with the urgency of the situation in the event of an emergency.
All equipment specified as necessary to the operation by the line management j
r' unction and radiation protection function shall be provided and operative.
2.4.3 A continuing program of surveillance, air sampling and smear sampling which is adequate to detect ventilation deficiencies and assure compliance with 10 CFR 20 limits, shall be conducted.
2.4.6 UF6 cylinders shall have valve covers in place when being moved except for those which have been processed and evacuated.
In the event that it is not practical to attach a valve cover to the cylinder, they may be transported without the valve covers provided that a supervisor or designee escort is provided (in addition to the individual operating the transport equipment), and the personnel involved with the transfers shall be knowledgeable in emegency actions to be taken in event of damage to the cylinder valve during the transfers.
2.4.5 Unless specifically exempted by license conditions, Westinghouse shall comply with the provisions of Title 10, Parts 19 and 20.
Chapter 1, Code of Federal Regulations, implementing A Site R1ysical Security Plan and procedures 2.4.6 shall be maintained in accordance with 10 CFR 73.67.
j 2.5 Emergency Plan Westinghouse shall implement,
- maintain, and execute the response measures of the Radiological Contingency
- Plan, submitted to the Commission on September 30, 1981 and supplemented on July 20, 1983, February 24, June 1, July 24, l
and September 11, 1984, July 18, 1985, September 18, 1986, January 29, 1988, February 8,
1988, and April 29, 1988.
Westinghouse shall also maintain implementing procedures for the Radiological Contingency Plan as necessary to implement the Plan.
This Radiological Contingency Plan and associated implementing procedures supersede the en.ergency planning requirements of 10 CFR 70.22(i) as they refer to onsite i
planning and notification procedures.
Westinghouse shall make no change in the Radiological Contingency Plan that would l
decrease the response 9ffectiveness of the Plan without prior Commission approval as evidenced by a license amendment.
Westinghouse may make cha?ces to the Radiological Contingency Plan without prior Commissivi approval if the changes do not decrose the response effectiveness of the Plan.
Westinghouse shall Docket No. 70-1151 Initial Submittal Date:
4/30/83 Page No.
2.5-1 License tb. Stfi-1107 Revision Submittal Date: 5/20/88 Revision No.
18
_