Monthly Operating Rept for Apr 1986
ML20197D299
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/30/1986
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8605140210
Download: ML20197D299 (5)


Text

.

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SIMfARY OF OPERATIONS April, 1986 During the month of April, there was one unit shutdown which occurred on April 4,1986 and initiated the Cycle IV - V refueling outage.

The following major safety-related maintenance was performed in the month of April:

1.

The reactor was de-fueled and visual inspections of the reactor vessel were completed.

The fuel, including 68 fresh assemblies, was placed back into the reactor vessel.

2.

Eddy current examinations were performed on tubes in all three steam generators. As a result of this inspection program, 70 tubes were plugged:

11 on the 2A steam generator, 15 on the 2B steam generator, and 44 on the 2C steam generator.

3.

Containment tendon 7FD had its anchor head removed, magnetic particle tested and replaced.

4.

The antivibration bars (AVBs) in the 2A and 2B steam generators were replaced with a modified design to increase bundle tightness and reduce wear.

5.

The upper internals and spare reactor head penetrations were modified and reactor vessel level monitoring probes were installed.

6.

Reactor vessel surveillance capsule "W" was removed from the j

reactor vessel and placed in the spent fuel pool.

It will be sent off-site for analysis.

7.

The "A" and "C" RCP seal inspection was perfer:ned.

8605140210 860430 PDR ADOCK 05000364 R

PDR

[&

t/i

OPERATING DATA REPORT DOCKET NO.

50-364 DATE R,v ?-

1986 COMPLETED BY

.T. n Unndard TELEPHONE (2051899-5156 OPERATING STATUS

1. Unit Name:

J seph M. Farlev - Unit 2 Notes 1) Cumulative data since

2. Reportm3 Period: April, 1986 7-30-81, date of comme.cial 2652 operation.
3. Licensed Thermal Power (MWt):

860

4. Nameplate Rating (Gross MWe):

829

5. Desagn Electncal Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

872.2 829.2

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:

N/A N/A

9. Power Level To Which Restricted,if An (/ANet MWe):

N

10. Reasons For Restrictions.If Any:

! O This Month Yr..to-Date Cur'nulative

11. Hours la Reporting Period 710 2 879 41.664
12. Number Of Hours Reactor Was Critical 95.9 2.226.1 41,032.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 95.8 2,218.3 35,610.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 239,320 5,738,093 89,972,643
17. Gross Electrical Energy Generated (MWH) 80,822 1,914,824 29,637,512
18. Net Electncal Energy Generated (MWH) 71,982 1,818,752 28,107,992
19. Unit Service Factor 13.3 77.1 85.5
20. Unit Availability Factor 13.3 77.1 85.5 12.1 76.2 83.1
21. Unit Capacity Factor (Using MDC Net) 12.1 76.2 81.4
22. Unit Capacity Factor (Using DER Net) 0.0 1.7 4.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

May 9. 1986

26. Units in Test Status iPrior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 5-6-81 5-8-81 INITIAL ELECTRICITY 5-24-81 5-25-81 8-1-81 7-30-81 COMMERCIAL OPERATION (9/77 ) -

. _.. _, -~ - - - _ _. -. _ _..,

~

DOCKET NO.

50-364 UNIT 2

DATE May 2, 1986 COMPLETED BY 3-D. Woodard Q

TF1 ** HONE (2051899-5156 310NTI]

April, 1986

/

DAY AVERACE DAILY FOWER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE-Net)

(51We-Net) 831 0

t t

g7 2

831 gg 0

~

g p -

3 19 - -

0 o

4' 712 7g 5

0 21 0

6 0

2 0

7 0

B 0

8 0

24 0

09 o

25-o 10 0

26 0

Ig 0

27 0

12 0

23 0

13 0

23 0

14 0

30 0

IS 0

33 16 0

I? CnUCDONS On this form:. list the 2ver:ge dsily unit powe:levelin MWe-Net for esch d:y in the reporting month. Compute to

, the neare:t whole megswatt.

(9(77)

O O

O UNITSilu1 DOWNS ANI) POWER REDUCHONS I)OCKET NO.

50-364 UNIT NAME..I. M. Farlev __ Unit 2 DATE M,v ?.

1986 COMPl.ETEI) BY J b. Woodard REPORT MONTil Apri1 TEl.EPilONE (2051899-5156

'*i-

's m '

.2 _e g

sf Licensec 5%

5*L Cause & Cosaccalve c

r.

g No.

D.inc

{

gg 7, g ge Evep uy

a. g gyg go,,,

b o 6.

jsg Repost #

fu

$d p,,,,,,g,c,,,,,c, 6

002 8604 04 S

623.2 C

1 N/A N/A N/A Unit was taken off line for the Cycle IV - V Refueling Outage.

l 2

3 4

F: Forced Reason:

Method:

Exhibit G - Insieuctions S: Scheduled A Eiguipioent Failure (Explain) 1-Manual for Preparatiini of Data B Maintenance of Test 2 Manual Scram.

Enisy slicets for 1icensee C Refueling 3 Automatic Scrans.

Event Repeu1 (1.ER) File INUREG-D Reguleituy Restsicche 4-Other (Explaisi) 0161)

E-Operator Training a license Examination F Adminisitative 5

G Operational Estor (Explain)

Exhibis 1 Same Sousee (9/77) 11 Olhei (Explain)

/

[hiting Address Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 7816MO R. P. Mcdonald Senior Vice President Flintridge Bu6iding Alabar11a Pon'er res::sr c c,cs>L May 9, 1986 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the April 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours very truly,

s. A. M~Am^p R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) i I

i I