_
Wo-7 2-Matthews i
N 1
Mark Matthews Acting Project Manager r KN ^
UraniumMilltailingsProje:tOffi
/*
h Al uguerque Operations Office /h [ce g De artment of Energy M
p UAN 2 7 1989 g*g
/ g %,
c 4
/g P.O. Box 5400 Q
e d,
TS Albuquerque, New Mexico 87115h
?
O y MJf #
W m
B J
Dear Mr. Matthews:
1
(,3 i
Tt.e V.S. Nuclear Regulatory Comm$'ssion (N )sf4ffhascompletedit'sr f
s
,a i
the preliminary final Remedial Actionflansan,d' Site Conceptual Design (RA o
e all associated documentation pertinent to the proposed remedial action for t M i
uranium mill tailings site at Spook, Wyoming.
Our review is documented in-the-i j
encloseddraftTechnicalEvaluationReportsTER),whichdiscusses-NRCstaff's evaluation of the proposed remedial action for compliance with the EPA standards.
j Based on our myiew, we are prepared to conditionally concur in DOE'S proposed i
remedial action once DOE has closed two confirmatory items, which are summarized A
in section 1.5 of the draft TER.
DOE needs to document the information or
- U commitments requested for both of these items in the final RAP submitted for our i-conditional concurrence. As noted in the draft TER, these items have been previously discussed with DOE staff.
i In addition to these confirmatory items, NRC staff has identified one open issue.
This issue relates to DOE's deferral of groundwater cleanup until after promulgation of EPA's final groundwater protection standards and is discussed in-i section 5.5 of the draft TER. While NRC staff considers DOE's deferral to be acceptable, it precludes us from being able to fully concur in the proposed remedial action.
Therefore, our concurrence will be conditional until the staff determines that DOE has adequately addressed this issue.
l' If you; have any questions regarding information in the enclosed draft TER, please contact me at FTS 492 0553 or the NRC Project Manager, Surin Bilhorn, at FTS 492 0573, t
EO e v,SlGEDBY IA941.
Paul H. Lohaus, Glef 9712290015 990127 Operations Branch i
PDR WASTE Division of Low-Level Waste w 72 Py L
~ Management and Decosmiissioning 0" CIAL DOCKET COPY
Enclosure:
Draft TER
-.cc:
Richard Richey,-DOE /AL Charles-Preston,WY/DEQ Distribution:-
Central File W 72 NMSS rf LLO8 rf t
MKnapp, LLWM J6 reeves, LLWM JSurmeier, LLTB
~MBell, LLR8 PLohaus,- LLO8 LDeertng, LLT8 TJohnson, LLO8 DGillen, LLOB JStarmer LLTS -
~JGrism, LLOB 8Jagannath,-LLT8-MTokar, LLTB
~ isiitith7Tro EV-435/
MF11egel, LLO8
$81 thorn,4 LLOS _.
p m
1 orc :LLos
- NM55
_ NM55
{
u
$ :LL gLLWM NAME:5811h 1 egel _:JSurmeTer:PLohaus u s
DATE: P ~~
19 : _ /; /89 : _/ /89 :
/ /89 q
t 3R
.a
-