Forwards Proprietary Rept of Corrections to ECCS Evaluation Model Which Documents Effect Upon Small Break LOCA Analysis of Greater than 50 F.Encl Withheld
ML20197C789
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/08/1998
From: Richard Anderson
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138K948 List:
References
NUDOCS 9809140199
Download: ML20197C789 (2)


Text

i Northern States Power Company 414 Nicollet Mall Minneapolis. Minnesota 55401-1927

)

Telephone (612) 330-5500 September 08, 1998 l

U S Nuclear Regulatory Commission 10 CFR Part 50 Attn Document Control Desk Section 50.46 Washington, DC 20555 Prairie Island Nuclear Generating Plant Docket Nos. 50-282 License Nos. DPR-42 j

50-306 DPR-60 Report of Corrections to ECCS Evaluation Models Attached is a report of corrections to Northern States Power company's (NSP) Emergency Core Cooling System (ECCS) Evaluation Models which documents an effect upon the Small Break LOCA analysis of greater than 5 0'F. This report is being submitted in accordance with the provisions of Title 10, Part 50, Section 46 of the Code of Federal Regulations.

The corrections noted in Attachment 1 have been applied to Northern States Power's current ECCS analyses of record, and all analyses were found to be in compliance with the applicable acceptance criteria (Attachment 2).

During a licensee-conducted surveillance, it was identified by NSP personnel that a rebaselining case calculated a PCT more limiting than what had been previously been submitted via the 50.46 reporting process.

/

The rebaselining case is the limiting break calculation for Prairie Island

/

which includes all of the code changes (prior 50.46 assessments) since the analysis of record.

7 [ jgr The Licensing Basis PCT including all margin allocations remains in compliance with 550.46 requirements; therefore, no reanalysis is required or planned.

However, the rebaselining case is currently being investigated by Westinghouse personnel in order to confirm the validity of the case and the subsequent PCT penalty of 259'F.

A schedule is included for the investigation of the rebaselining case.

The review of the

  • 9t.,f rebaselining case, and the subsequent conclusions will be completed by

' ' ' Westinghouse no later than December 04, 1998.

Please contact Jack Leveille (612-388-1121, Ext. 4662) if you have any 1

questions related to this letter.

1 9809140199 980908 PDR ADOCK 05000282 P

PDR

y e<

e

/

W W8 l. f,(

Roger O. Anderson r

Director Licensing and Management Issues c:

Regional Administrator-III, NRC Senior Resident Inspector, NRC NRR Project Manager, NRC J Silberg Attachments 1 10 CFR 50.46 Report of Changes Affecting PCT 2.

10 CFR 50.46 Report Peak Clad Temperature Margin Utilization Sheets

-