ML20197C629

From kanterella
Jump to navigation Jump to search
Supplements 961016 TS Change Request NPF-38-186,by Proposing to Retain Operations Superintendent in Paragraph 6.2.2.f of Administrative Control Section,Per NRC Administrative Ltr 95-06 & NUREG-1432
ML20197C629
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/22/1997
From: Dugger C
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20197C634 List:
References
RTR-NUREG-1432 AD-95-06, AD-95-6, W3F1-97-0283, W3F1-97-283, NUDOCS 9712240235
Download: ML20197C629 (3)


Text

f

/

i.

Ente y Operations. l.tc.

kg/

/.

Katona, LA 700060751 Tel 504 739 6 FA '

e Fre n

aions wnm 3 l

W3F1-97-0283 A4.05 PR Decen.ber 22,1997 U.S. Nuclear Regulatory Commission

~ Attn: Document Centrol Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50 382 License No. NPF-38 Suoplement to Technical Specification Change Request NPF-38-186 Gentlemen:

By letter from M.B. Sellman to U.S. NRC Document Control Desk dated October 16, 1996, Waterford 3 submitted Technical Specification Change Request (TSCR) NPF-38-186. This TSCR requested the following changes to the Waterford 3 Aciministrative Controls TS: 1) relocate certain administrative controls to the Quality Assurance Program Manual as described in NRC Administrative Letter 95-06,

" Relocation of Technical Administrative Controls Related to Quality Assurance," 2) change shift coverage from 8-hour day,40 hour4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> weeks to an option of 8 or 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> days and nominal 40-hour weeks; and 3) make certain editorial changes to the titles of certain organizational positions.-

The attached TS page supplements the editorial changes of the TSCR described above Waterford 3 has recently reinstated the Operations Superintendent position, therefore, this supplement proposes to retain the Operations Superintendent in paragraph 6.2.2.f of the Administrative Controls Section. The proposed

- Administrative Controls Section 6.2.2.f requires either the Operations Manager or the

' Operations Superintendent to hold a senior scactor op+ rator (SRO) license. This change is consistent with NUREG-1432, " Standard Technical Specificat:ons Combustion Engineering Plants,"which requires either the Operations Manager or the Assistant Operations Manager to bnid an SRO license.

Ah a mI

\\

E "*E" U N 'a=

ll 1.10llll1 ll!!.lll.l pj% / i J

N e

m i

/

~'

Technical Specification Change Request NPF-38-186 W3F1-97-0283 -

Page 2 -

- December 22,1997 Please replace page 6-2a in Attachment B of TS Change Request NPF-38-186 with the attached page. This change has no effect on the previously provided no signFicant hazards evaluation.

Should you have any questions or commerits concerning this request, please contact either Early Ewing at (504) 739-6242 or Tim Geudet at (534) 739-6666.

L Very truly yours, l

w1 C. M. Dugger Vice Prasident, Operations _.

Waterford 3 CMD/CED/ssi

.- Attachments:

Affidavit Supplement to TSCR NPF-38-186 cc:

E.W. Merr -'.off, NRC Region IV C.P. Patel, NRC-NRR J. Smith N.S. Reynolds NRC Resident inspectors Office Administrator Radiation Protection Division-(State of Louisiana)-

American Nuclear insurers l1 d

L. 1.

^

1

~

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION in the m:stter of

)

1 Entergy Operations, incorporated

)

Docket No. 50-382 Waterford 3 Steam Electric Station

)

AFFIDAVIT Charles Marshall Dugger, being duly sworn, hereby deposes and says that he is Vice President Operations - Waterford 3 of Entergy Operations, incorporated; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Supplement to Technical Specification Change Request NPF-38-186; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.

S

/<Jme Charles Marshall Dugger Vice President Operations - Waterford 3 STAT E OF LOUlGIANA

)

) ss PARISH OF ST. CHARLES

)

Subscribed and sworn to be, fore me,yNptary Publicji and for the Parish and State above named this - 2 ' ' day of N' -

A

,1997.

~

cw W,e Notary'Public My Commission expires /A@/.

_ _ _ _ _ _ _ _ _ _ _ _ _ -