ML20197B744

From kanterella
Jump to navigation Jump to search
Fr Notice of Issuance & Availability of License NPF-59
ML20197B744
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 10/17/1986
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19303E337 List:
References
NUDOCS 8610300395
Download: ML20197B744 (6)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

7590-01 COMMONWEALTH EDISON COMPANY BRAIDWOOD STATION, UNIT NO. 1 DOCKET NO. 50-456 NOTICE OF ISSUANCE OF FACILITY OPERATING LICENSE Notice is hereby given that the U.S. Nuclear Regulatory Commission (the J

Commission or NRC), has issued Facility Operating License No. NPF-59 to Commonwealth Edison Company (the licensee) which authorized fuel loading and pre-critical testing for the Braidwood Station, Unit No. 1 (the facility).

The license was issued with Technical Specifications (Appendix A) and the l

Environmental Protection Plan (Appendix B).

Braidwood Station, Unit No.1 is a pressurized water reactor located in Will County, Illinois, about 20 miles south-southwest of Joliet, Illinois in Reed Township. The license is effective as of the date of issuance.

The application for the license complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations. The Commission has made appropriate findings as required by the Act and the Commission's regulations in 10 CFR Chapter I which are set forth 1,n the License.

Prior public notice of the overall action involving the proposed issuance of an operating license was published in the Federal Register on December 15, 1978 (43 FR 58659).

8610300395 861017 PDR ADOCK 05000456 P

PDR

\\

7590-01

~ '

The Commission has determined that the issuance of this license will not result in any environmental impacts other than those evaluated in the Final Environmental Statement and the Assessment of the Effect of License Duration on Matters Discussed in the Final Environmental Statement for the Braidwood Station, Units 1 and 2 (dated June 1984) since the activity authorized by the license is encompassed by the overall action evaluated in the Final Environmental Statement.

For further details with respect to this action, see (1) Facility Operating License No. NPF-59, with Technical Specifications and the Environmental Protection Plan; (2) the report of the Advisory Committee on Reactor Safeguards, dated February 11, 1985; (3) the Commission's Safety Evaluation Report, dated November 1983, (NUREG-1002), and Supplements 1 through 2; (4) the Final Safety Analy is Report and Amendments thereto; (5) the Environmental Report and supplements thereto; (6) and the Final Environmental Statement, dated June 1984, (NUREG-1026).

These items are available for inspection at the Commission's Public Document Room located at 1717 H Street, N.W. Washington, D.C. 20555 and in the Wilmington Township Public Library, 201 S. Kanakee Street, 4fimington, Illinois 60481.

A copy of Facility Operating License NPF-59 may be obtained upon request addressed to th U.S. Nuclear Regulatory Commission, Washington D.C. 20555, Attention:

Director, Division of PWR Licensing-A. Copies of the Safety Evaluation Report

7590-01

. and Supplements 1 through 2 (NUREG-1002) and the Final Environmental Statement (NUREG-1026) may be purchased at current rates from the National Technical Information Service, Department of Commerce, 5285 Port Royal Road, Springfield, Virginia 22161, and through the NRC GP0 sales program by writing to the Superintendent of Documents, U.S. Government Printing Office, Post Office Box 37082, Washington, D.C. 20013-7082.

DatedatBethesda,Marylandthish_h day of M 986.

3 FOR THE NUCLEAR REGULATORY COWIISSION i

aYg or Project Directorat Division of PWR Licensing-A T

4

..-r,

,.c.,._

+

[g#" "Ds, UNITED STATES NUCLEAR REGULATORY COMMISSION 3

j WASHINGTON, D. C. 20555 e

s.,...+/

Docket No. 50-456 AMENDMENT TO INDEMNITY AGREEMENT NO. B-102 AMENDMENT NO. 1 Effective October 17,IMnity Agreement No. B-102, between Commonwealth Edison Company and the Nuclear Regulatory Commission, dated October 8,1985, is hereby amended as follows:

Item 2a of the Attachment to the indemnity agreement is deleted in its entirety and the following substituted therefor:

Item 2 - Amount of financial protection

a. $1,000,000 (From 12:01 a.m., October 8, 1985 to 12 midnight, October 16, 1986 inclusive)

$160,000,000*

(From 12:01 a.m.,

October 17, 1986 Item 3 of the Attachment to the indemnity agreement is deleted in its entirety and the following substituted therefor:

Item 3 - Licensee number or numbers SNM-1938 (From 12:01 a.m., October 28, 1985 to t,

October 16, 1986 NPF-59 (From 12:01 a.m.,

October 17, 1986

  • and, as of August 1, 1977, the amount available as secondary financial protection.
W i *.

Item 5 of the Attachment to the indemnity agreement is amended by adding the following:

Nuclear Energy Liability Policy (Facility Form)

No. MF-128 issued by Mutual Atomic Energy Liability Underwriters FOR THE U. S. NUCLEAR REGULATORY COPNISSION l

r bt)sRV (IEtA Darrel A.~ Nash, Acting Assistant Director State and Licensee Relations Office of State Programs I

Accepted 1986 4

By COMMONWEALTH ED5 ION COMPANY i

}

}

~_ - -_--

o e

SUBJECT:

ISSUANCE OF FACILITY OPERATING LICENSE NO. NPF-59 FOR BRAIDWOOD STATION, UNIT 1 INTERNAL DISTRIBUTION Docket' Files

  • NRC PDR*

Local PDR*

PD#5 R/F JStevens (2)*

MRushbrook(5)*

TNovak*

JSaltzman, SP IDinitz,SP OPR HDenton WLamb, P&RAB RDiggs JPartlow BGrimes*

EJordan*

LHarmon TBarnhart IBailey*

S. Treby, 0GC*

JRutberg/B. Vogler, 0GC JScinto, 0GC ACRS (10)

C. Miles, PA J. Marnella Rodriguez, RM/AF0 L. Solander, PPAS C. James Holloway, Jr., D/LFMB, ADM

  • with Technical Specifications