ML20197B691

From kanterella
Jump to navigation Jump to search
Contends NRC shut-down Order for Gen Elec Test Reactor Be Made Permanent Since Safety Against Maximum Seismic Activity Can Not Be Guaranteed.Also Requests Discharges of Tritium Cease & Info on Hearings Be Provided
ML20197B691
Person / Time
Site: 07000754, Vallecitos  File:GEH Hitachi icon.png
Issue date: 10/15/1978
From: Wolch H
External Citizen/Individual/Media (Affiliation Not Assigned)
To: Hendrie J
NRC COMMISSION (OCM)
Shared Package
ML20197B610 List:
References
NUDOCS 7811080056
Download: ML20197B691 (1)


Text

_ __ _____________________

-. a 18313 Pepper Street Castro Valley, CA 94546 October 15, 1978 Joseph Hendrie, Chairman l

United States Nuclear Regulatory Commission Washington, D.C.

20555 Re:

Vallecitos Nuclear Center (Docket Nos. 50-70 and 70-754) i

Dear Mr. Hendrie:

Operation of the General Electric Test Reactor at the Vallecitos Nuclear Center near Pleasanton, California, has been shut down by order of the Commission.

We contend this order should be made permanent unless it can be shcwn that the present reactor and all its operating facilities are, or can be made, proof against the maximum seismic activity expected for the area.

In the absence of evidence acceptable to the general public, seismic safety experts and seismologists, we urge - we demand - that the GETR be permanently shut down.

Regardless of the outcome of proceedings to close SETR permanently, it is imperative that G.E. be pronibited from further discharging tritium gas, triticated water or any other I

radioactive isotope into the environment.

There is mounting i

evidence that there is no threshold, in humans, for tolerance I

of ionizing radiation.

Tritium is objectionable since it readily exchanges with hydrogen of water and organic materials.

We are at a loss to know why Vallecitos has a Licens2 (No. SNM-960) to store up to 150 kg. of plutonium.

We, the residents of this part of California, have a right to knew what is being done with plutonium at the Nuclear Materiala l

Laboratory, and if this activity is in the national interest or solely of commercial interest to G.E.

Please advise us of all Hearings to be held regarcing the Vallecites Nuclear Center.

Sincenely,

[J.<-u b

,s,

\\ d. -

.. :.~

i.

Dr. 5 Mrs. Hiram Wolch cc:

Senator Alan Cransten Senator S.I. Hayakawa Congressman Portney P. Stark Calif. Assemblyman Wm. Lockyer l

Calif. Assemblyman S.

Floyd Mori Senator John Holmdahl 78j,1(}@ 0 C Tl.

Congressman Don Edwards G

.