Category:CORRESPONDENCE-LETTERS
MONTHYEARML20082L8221983-11-21021 November 1983 Forwards QA Program Topical Rept Gibsar 17A,Amend 7 Per 831019 Acceptance Ltr & Vendor Program Branch Rept.Rept Withheld ML20024E9321983-08-31031 August 1983 Forwards Draft Amend 7 to Gibsar 17-A, QA Program. ML20027C7131982-10-25025 October 1982 Forwards QA Program,Topical Rept Gibsar 17-A,Amend 6 ML20011A8831981-10-28028 October 1981 Forwards Amend 5 to QA Program Topical Rept GIBSAR-17-A & 810812 Acceptance Ltr Per 810812 Request.Amend Incorporates Organization Changes Accepted by 810901 Ltr ML20009E6641981-07-21021 July 1981 Forwards Proposed Changes to Amend 5 Describing Procurement at Regional Ofcs,In Response to 810720 Telcon ML19253C9891979-11-30030 November 1979 Forwards Verification Documents for in-house Computer Programs Sconv,Spectra,Quake & Time,In Support of Response to NRC Question 131.63 ML19253C8921979-11-30030 November 1979 Forwards Amend 15 to Gibbsar ML20049A1801979-04-0202 April 1979 QA Program Rept GIBSAR.17A Is Applicable to Gibbs & Hill Std Plant.Forwards Procedures for Establishing Project ML19289D8511979-03-0909 March 1979 Forwards Amend 10 to Gibbsar ML19269C7261979-02-0707 February 1979 Forwards Amend 9 to Balance of Plant Standard SAR Re RESAR-414.Amend Includes Responses to NRC Questions ML19308A1871978-12-27027 December 1978 Forwards Copy of Suppl to Amend 8 to Gibbssar,The Gibbs & Hill Inc Balance of Plant Standard Safety Analysis Rept Referencing RESAR-414.Incl Info Incorp in Response to NRC Question 010.64 & 311.19 ML20147D1891978-12-15015 December 1978 Forwards Amend 8 to Gibbssar Balance of Plant Standard Safety Analysis Rept Referencing RESAR-414.Requested Main Steam Line Break Analyses Have Been Incl in Section 6.2.1.1. Amend Incl Responses to Various Branch Questions ML20147C7771978-12-0707 December 1978 Forwards Rev Gibbsar Review Sched & Pda Extension Review Matters. Items Incl:Design Conformity & Safety Matters ML20148H1771978-11-0303 November 1978 Forwards Request for Addl Info of Round 2 Questions That Is Req for Completion of Review.Requests Response to Sections W/Notation RSP by 781215 ML20148F3471978-10-30030 October 1978 Forwards Request for Addl Info by 781215 Re Environ Qual of Safety Related Equip Including Elec Containment & Cables, Pressure & Level Transmitters,Containment Isolation Valves, Containment Mass & Energy Releases & ESF Components ML20197B5591978-10-30030 October 1978 Response to 780815 Hutchison Ltr & 780823 Prieto Ltr. Thorough Review of Gibbssar'S Pda Covered All Specific Concerns Identified by the Encl Questions of First Availability & Relative Scheduling ML20197B5781978-08-23023 August 1978 Forwards from Hutchison to HR Denton Re Appl for Preliminary Design Approval for Facil ML20197B5871978-08-15015 August 1978 Comments Re 780809 Meeting with Applicant Re Pda. Dissapointed W/Low Priority Given Applicant.Requests Meeting to Discuss NRC Priorities 1983-08-31
[Table view] Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC
MONTHYEARML20082L8221983-11-21021 November 1983 Forwards QA Program Topical Rept Gibsar 17A,Amend 7 Per 831019 Acceptance Ltr & Vendor Program Branch Rept.Rept Withheld ML20024E9321983-08-31031 August 1983 Forwards Draft Amend 7 to Gibsar 17-A, QA Program. ML20027C7131982-10-25025 October 1982 Forwards QA Program,Topical Rept Gibsar 17-A,Amend 6 ML20011A8831981-10-28028 October 1981 Forwards Amend 5 to QA Program Topical Rept GIBSAR-17-A & 810812 Acceptance Ltr Per 810812 Request.Amend Incorporates Organization Changes Accepted by 810901 Ltr ML20009E6641981-07-21021 July 1981 Forwards Proposed Changes to Amend 5 Describing Procurement at Regional Ofcs,In Response to 810720 Telcon ML19253C9891979-11-30030 November 1979 Forwards Verification Documents for in-house Computer Programs Sconv,Spectra,Quake & Time,In Support of Response to NRC Question 131.63 ML19253C8921979-11-30030 November 1979 Forwards Amend 15 to Gibbsar ML20049A1801979-04-0202 April 1979 QA Program Rept GIBSAR.17A Is Applicable to Gibbs & Hill Std Plant.Forwards Procedures for Establishing Project ML19289D8511979-03-0909 March 1979 Forwards Amend 10 to Gibbsar ML19269C7261979-02-0707 February 1979 Forwards Amend 9 to Balance of Plant Standard SAR Re RESAR-414.Amend Includes Responses to NRC Questions ML19308A1871978-12-27027 December 1978 Forwards Copy of Suppl to Amend 8 to Gibbssar,The Gibbs & Hill Inc Balance of Plant Standard Safety Analysis Rept Referencing RESAR-414.Incl Info Incorp in Response to NRC Question 010.64 & 311.19 ML20147D1891978-12-15015 December 1978 Forwards Amend 8 to Gibbssar Balance of Plant Standard Safety Analysis Rept Referencing RESAR-414.Requested Main Steam Line Break Analyses Have Been Incl in Section 6.2.1.1. Amend Incl Responses to Various Branch Questions ML20197B5781978-08-23023 August 1978 Forwards from Hutchison to HR Denton Re Appl for Preliminary Design Approval for Facil ML20197B5871978-08-15015 August 1978 Comments Re 780809 Meeting with Applicant Re Pda. Dissapointed W/Low Priority Given Applicant.Requests Meeting to Discuss NRC Priorities 1983-08-31
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20082L8221983-11-21021 November 1983 Forwards QA Program Topical Rept Gibsar 17A,Amend 7 Per 831019 Acceptance Ltr & Vendor Program Branch Rept.Rept Withheld ML20024E9321983-08-31031 August 1983 Forwards Draft Amend 7 to Gibsar 17-A, QA Program. ML20027C7131982-10-25025 October 1982 Forwards QA Program,Topical Rept Gibsar 17-A,Amend 6 ML20011A8831981-10-28028 October 1981 Forwards Amend 5 to QA Program Topical Rept GIBSAR-17-A & 810812 Acceptance Ltr Per 810812 Request.Amend Incorporates Organization Changes Accepted by 810901 Ltr ML20009E6641981-07-21021 July 1981 Forwards Proposed Changes to Amend 5 Describing Procurement at Regional Ofcs,In Response to 810720 Telcon ML19253C9891979-11-30030 November 1979 Forwards Verification Documents for in-house Computer Programs Sconv,Spectra,Quake & Time,In Support of Response to NRC Question 131.63 ML19253C8921979-11-30030 November 1979 Forwards Amend 15 to Gibbsar ML20049A1801979-04-0202 April 1979 QA Program Rept GIBSAR.17A Is Applicable to Gibbs & Hill Std Plant.Forwards Procedures for Establishing Project ML19289D8511979-03-0909 March 1979 Forwards Amend 10 to Gibbsar ML19269C7261979-02-0707 February 1979 Forwards Amend 9 to Balance of Plant Standard SAR Re RESAR-414.Amend Includes Responses to NRC Questions ML19308A1871978-12-27027 December 1978 Forwards Copy of Suppl to Amend 8 to Gibbssar,The Gibbs & Hill Inc Balance of Plant Standard Safety Analysis Rept Referencing RESAR-414.Incl Info Incorp in Response to NRC Question 010.64 & 311.19 ML20147D1891978-12-15015 December 1978 Forwards Amend 8 to Gibbssar Balance of Plant Standard Safety Analysis Rept Referencing RESAR-414.Requested Main Steam Line Break Analyses Have Been Incl in Section 6.2.1.1. Amend Incl Responses to Various Branch Questions ML20197B5781978-08-23023 August 1978 Forwards from Hutchison to HR Denton Re Appl for Preliminary Design Approval for Facil ML20197B5871978-08-15015 August 1978 Comments Re 780809 Meeting with Applicant Re Pda. Dissapointed W/Low Priority Given Applicant.Requests Meeting to Discuss NRC Priorities 1983-08-31
[Table view] |
Text
. _ - _ __
- Gibbs 8 Hill. Inc.
' cIoi~E cas oc sio~cas co~o raucteas O ' " ' " ""'~" ~
msi no 5167 August 15, 1978 LGfi-NRC-46 Director's Office of File: 5.1.4 Nuclear Reactor Regulation - -
U.S. Nuclear Regulatory Commission -
Hashington, D.C. 20555 Attention: Mr. Harold Denton #
Subject:
Gibb: & Hill, Inc. Application for Preliminary Design Approval (GIDBSSAR, STN-50-584)
Mr. Denton:
We were greatly disturbed by the disheartening ne s presented at l
your meeting with applicants on August 9, 1978. In particular, the current low priority of our application does not, in our opinion, reflect proper consideration of the following:
- 1. The current, emphasis placed on standardization in administra-tion and legislative statements of policy including concomi-tant efforts on the part of the NRC as exemplified in the creation of a separate branch to review these applications.
- 2. The duration of review to which we have already been subject-ed (22 months since date of application, 15 months since date of docketing) .
- 3. Effective duration of our application given the impending re-ceipt of PDA by our reference NSSS (RESAR-414, filed with NRC 1 week prior to GIBBSSAR application).
- 4. Commitment of resources required by A/E's to participate in the NRC standardization program, and in particular the measures spent and committed by G&H.
We request a meeting to discuss the effect of the NRC priorities on the G6H standardization ef fort.
Sin croly you ,
G S &JI f Inc ~
x j / './j, 78//D TD053 i L.
PD:mm
/-
F.D. Hutchinson Vice Presi-dent - Engineering 393 stvtNTH AVE NUE NEW YORM, td . Y. 10001 C A OL E ' Gih DsHIL L. Ng w YORM
.~.. .
Gibbs 8 Hill. Inc.
E NGINE E RS DE SIG N E R S CONSTRtlCTORS DIR E CT DIAL EXT E N SION m e veD. 5167 August 15, 1978 LGH-NRC-46 File: 5.1.4 U. S. Regulatory Commission Washington, D.C. 20555 Attention: Mr. Harold Denton ,
1
Subject:
Gibbs & Hill, Inc. Application for Preliminary Design Approval (GIBBSSAR, STN-50-584)
Mr. Denton:
We were greatly disturbed by the disheartening news presented at your meeting with applicants on August 9, 1978. In particular, the current low priority of our application does riot, in our opinion, reflect proper consideration of the following:
- 1. The current emphasis placed on standardization in administra-tion and legislative statements of policy including concomi-tant efforts on the part of the NRC as exemplified in the creation of a separate branch to review these applications.
- 2. The duration of review to which we have already been subject-ed (22 months since date of application, 15 months since date of docketing).
- 3. Effective duration efep_ur application given the impending re-ceipt of PDA by our reference NSSS (RESAR-414, filed with NRC 1 week prior to GIBBSSAR application).
-4 . Commitment of resources required by A/E's to participate in
- the NRC standardization program, and in particular the measures spent and committed by G&H.
We request a meeting to discuss the effect of the NRC priorities on the G&H standardization effort.
Sin ely your ;,
G &' II4 W N / p/
FD:mm F.D.
AHutchinson v ', Vice President - Engineering
- _ - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ . _ _ .