ML20197B285

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 99900521/86-01 on 860117-20.No Violation or Nonconformance Noted
ML20197B285
Person / Time
Issue date: 05/09/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Hinkleman L
BECHTEL GROUP, INC.
Shared Package
ML20197B289 List:
References
REF-QA-99900521 NUDOCS 8605120499
Download: ML20197B285 (3)


Text

{{#Wiki_filter:' :- o, UNITED STATES

g. - !

NUCLEAR REGULATORY COMMISSION y, j wasmucton. o. c. 2osss Fay 9, 1986 ....+ Docket No. 99900521/86-01 Bechtel Power Corporation Western Power Division ATTN: Mr. L. G. Hinkleman Vice President and General Manager 12400 East Imperial Highway Norwalk, California 90650 Gentlemen: This refers to the inspection conducted by Messrs. P. Milano and R. McIntyre of this office on January 17-20, 1986, at the Bechtel Power San Francisco Area Office. A discussion of our findings at the conclusion of the inspection was presented to Mr. J. Friend and members of your staff. The purpose of this inspection was to followup on allegations presented to the NRC concerning quality assurance training at your San Francisco office, and potentially incorrect pipe support loading used at Peach Bottom Station. Addition-ally, the documentation and certification of code certifying personnel was reviewed. The areas examined during the inspection and our findings are discussed in the enclosed report. The inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors. While the allegations were not substantiated, a concern with the pipe support loading conditions could not be evaluated during the inspection because of insufficient documentation. Please inform us when the appro-priate documentation is available for inspection. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. 8605120499 860509 PDR GA999 EECDECH // 99900521 PDR / 3

i .s Bechtel Corporation Fay 9, 1986 Should you have any questions concerning this inspection, we will be pleased to discuss them with you. Sincerely, C-{.q Gary G. ch, ef Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement

Enclosure:

Inspection Report No. 99900521/86-01 cc: Philadelphia Electric 2301 Market Street Philadelphia, PA 19105

4 -Bechtel Corporation May 9, 1986 Should you have any questions concerning this inspection, we will be pleased to discuss them with you. Sincerely, WWWF cerye.zana e Gary G. Zech, Chief Vendor Program Branch Division of Quality Assurange, Vendor and Technical Training Center Programs Office of Inspection and Enforcement

Enclosure:

Inspection Report No. 99900521/86-01 cc: Philadelphia Electric 2301 Market Street Philadelphia, PA 19105 Distribution: Ma VPB Reading L DQAVT Reading RVollmer PMilano (2) RMcIntyre JCraig LParker JStone RGallo, RI TJohnson, SRI, Peach Bottom Station, RI GGears, NRR VIG / M B:DQAVT VPB:0QAVT S /VPB:DQAVT PMilano:tt J raig GGZep 4 /tV86 / 34/86 f/3/86 Q , f0 /}}