ML20197A891

From kanterella
Jump to navigation Jump to search
Forwards Rev 21,change 3 to Er 3.3, Emergency Operations Facility Operations, of Emergency Response Manual (Sser)
ML20197A891
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/04/1998
From: Peschel J
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20197A897 List:
References
NYN-98029, NUDOCS 9803100022
Download: ML20197A891 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _

=

d 9 16,,,

\ gg North Atlantic Energy Menire Corporation 18.0, Hos 300 n

Atlantic se i na Nii mm (603) 474M21 The Northeast L &,. System March 4,1998 l Docket h 50 443 NYN 98029 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Seahrook Station Emergenev Resnonse Manual Undate Enclosed, please find Revision 21. Change 03 to Procedure ER 3,3 of the Scabrook Station Emergency Response hianual(SSER). This implementing procedure revision was reviewed per the criteria of 10 CFR 50.54(q) and it was determined that it does not decrease the effectiveness of the Seabrook Station Radiological Emergency Plan (SSREP). This change is submitted per the requirements of 10 CFR 50, Appendix E, and 10 CFR 50.4. The Resident inspector copies are provided directly through the North Atlantic records management system.

Should you have eny questions regarding the enclosed SSER revision, please call me at (603) 773 7194.

Very truly yours, NORTil ATLANT C ENERGY SERVICE CORP.

1A .

Jar s hl. Pcsc'liel gulatory Compliance Manager cc (with enclosures):

s

11. J. hiiller, Regional Administrator (two copies of SSER) .

j; C. W. Smith, Project hianager (one copy of SSER)

M. j cc (without enclosures):

R. K. Lorson, NRC Senior Resident inspector 9003100022 980304 PDR ADOCK 05000443 { l\$l(\h }\fklkkk$\k L *-

F PDR ,

NYN 98029 I

DIERGEXCY RESEDNSI: MAhUAL UI'DATE

. (without endosure)

Carrier, D. e-mail Cuoco, I ., hi. e m ail Garfield, G. e m ail Gillespie, J. Millstone 475/5 i Millstone Nuclear 1.icensing e mail l Quinlan, W. J. e m ail Tailleart, D. it. e mail l'ile 0001 01-48 l'ile 0700 01-48 11MD 02-06

s DATE: 02/19/98 CONTROLLED DOCUMENT TRANSMITTAL NO: C165-T-000189 PAGE: 1 ATTN DCC/NRC WASHINGTON THE ATTACHED DOCUMENTS (IDENTIFIED BELOW)

REPRESENT A CHANGE TO YOUR CONTROLLED DOCUMENT FILES PLEASE ENSURE THAT ALL DOCUMENTS REFERENCED ARE ATTACHED. ACKNOWLEDGE RECEIPT OF THIS TRANSMITTAL SY l

COMPLETING THE ENDORSEMENT BELOW AND RETURNING THIS TRAN$NITTAL TO THE RMD BY 03/05/98. THIS WILL INDICATE THAT YOU HAVE RECEIVED THE ATTACHED CONTROLLED DOCU-MENTS AND PROCESSED THEM IN ACCORDANCE WITH NARM CHAPTER 3, SECTION 10. UNLESS DIRECTED OTHERWISE BELOW OR SY DEPARTMENTAL Gd! DANCE, DESTROY SUPERCEDED COPIES.

$UPERCEDED COPIES RETAINED FOR RECORD PURPOSES MUST BE STAMPED INFORMATION ONLY.

SUP PURCH/ ORDER PK0/ DOCUMENT IDENT. SHEET ID  !$$/REV QUANTITY IS$UE PRV RETURN ERS.3 021/C05 1 1- -

REPLACE ENTIRE PROCEDURE //SSER l

I l

l

  • FOR PLANNINO 8 SCHEDULIN USE ONLY M N s' A

___WORKCOMPLETED($TATUSCODE16OROREATE1hR OTHER (EXPLAIN) '

OVE PACKAGE FROM DDS u u u RECEIP ACKNOWLEDGEMENT RECEIVED BY: /d' t / DA1E SION AND RETURN .9 N f 8 RECORDS MANAGEMENT DEPARTMENT 02-85 5" T* SEABROOK $TATION P. O. BOX 300 SEABROOK, NH 03874 NARM TRANSMITTAL 3-10B/DDS WORK ORDER NO: 194607

)