ML20197A886
| ML20197A886 | |
| Person / Time | |
|---|---|
| Issue date: | 03/04/1998 |
| From: | Black S NRC (Affiliation Not Assigned) |
| To: | Tynell M SWEDEN, GOVT. OF |
| References | |
| REF-QA-99901326 99901326-97-01, 99901326-97-1, NUDOCS 9803100021 | |
| Download: ML20197A886 (1) | |
Text
_ _ _ _ _ _ _ _ _ _. _ _ _ _ - _ _ _ _
-March 4, 1998 Mats Tynell, General Manager Product Center Steam Generator Tubing AB Sandvik Steel 20-SZGQ -
S-81181 Sandviken Sweden
SUBJECT:
RESPONSE TO NRC INSPECTION REPOR199901326/97-01 AND NOTICE OF NONCONFORMANCE e
Dear Mr. Tynell:
Thank you for your letter of February 5,1998, in response to our January 2,1998, letter and Notice ci *'4onconformance conceming control of thermal treatment of steam generator tubing. We have reviewed your reply and find it responsive to the concems raised in our Notice of Nonconformance. The implementation of your corrective actions may be reviewed during a future inspection to determine that full compliance has been achieved and will be maintained, Sincerely, original signed by Suzanne C. Black, Chief Quality Assurance, Vendor inspection, and Maintenance Branch Division of Reactor Controls and Human Factors l
Office of Nuclear Reactor Regulation Docket 14o.: 99901326 DISTRIBUTION:
HQMB R/F PM for South Texas Project PUBLIC GCwalina
-Central Files / Docket File No. 99901326 t
- See previous concurrence DCCUMENT NAME: G:\\ DRAFT \\CWAL!NA\\SANDVIK.AK To receNo copy of document, indicate in box: 'C' = Copy without enclosures *E" = Copy with enclosures 1*N' = No copy RIV:TA:DRS E
EMCB:DE E
HOM'3:DRCH HOMB:DRCH W IBarnes/imb PJRush RAGramm SCBlack 4h 02/27/98*
03/02/98*
03/02/98*
02/ 3 /98 OFFICIAL RECORD COPY p[ -
go 8 'fv
,ga IS!B R!f @Bi!TER 80Py g >'
Li.lE.ll;lllll.lill.l[I.llu, ll 9903100021 980304 PDR GA999 EFGSW cy fc/J,76 99901326 PDR