Submits Results of Breaker Alignment Checks & Pole Shaft Weld Insps,Per NRC Bulletin 88-001.Only DS-416-type Breakers Utilized in safety-related Applications.Pole Shaft for Reactor Trip Bypass Breaker Rejected
ML20196L650
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/29/1988
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
IEB-88-001, IEB-88-1, SL-4871, NUDOCS 8807080103
Download: ML20196L650 (2)


Text

M Georg a Power Company 333 F.Mmont Avenue

  • A1!arta, Georgia 30308 Te!ephone 404 526 6526 Maibng Address Post Office Box 4545 A:1ar.ta. Georg:a 30302 GeorgiaPower Nuclear Operations Departmerit

!? " APem ene mtem SL-4871 1069U X7GJ17-V110 June 2' 1988 U. S. 'aclear Regulatory Commission Attention:

Document Control Desk Hashington, D.C.

20555 PLANT V0GTLE - UNIT 2 NRC DOCKET 50-425 CONSTRUCTION PERMIT CPPR-109 RESPONSE TO BULLETIN 88-01 "DEEECTS IN HESTINGHOUSE CIRCUIT BREAKERS" Gentlemen:

The subject NRC Bulletin, dated February 5,

1988, requested that Georgia Power Company submit a letter cf confirmation for completion of checks and inspections for certain Westinghouse circuit breakers.

By our letter of April 7, 1988, we provided the confirmation for Plant Haten and Plant Vogtle Unit 1.

At that time we stated that the confirmation for Plant Vogtle Unit 2 would be performed and the results submitted prior to initial fuel load.

The checks and inspections required by the Bulletin were completed June 6,1988.

The purpose of this letter is to submit the results of the breaker alignment checks and pole shaft weld inspections for Plant Vogtle Unit 2.

Of the five Westinghoose breaker types cited in the Bulletin, only the DS-416 type breakers are used at Plant Vogtle.

The four Unit 2 DS-416 breakers in safety-related applications were examined using Maintenance Procedure 27765-C, "Westinghouse Type DS-416 Circuit Breaker Maintenance",

Revision 10.

Both the short-term and long-term inspection requirements of the Bulletin were performed at the same time.

The pole shaft for Reactor Trip Bypass Breaker

'B' was rejected based on ti:e size and length of one weld.

The subject pole shaft was replaced with a s.,are shaft which passed inspection.

The remaining welds which were inspectci were satisfactory.

Alignments were also satisfactory.

This letter concludes our response to the subject Bulletin.

If ycu have any further questions in this regard, please contact this office.

0

$2 t

I f

880708o103 880629 ADOCK0500g25 DR

R e:

GeorgiaPower d U. S. Nuclear Regulatory Commission June 29, 1988 Page Two Mr. H. G. Hairston states that he is Sanior Vice President of Georgia l

Power Compaly and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in tr.is letter are true.

GEORGIA POWER COMPANY By: N-

!C A

H. G. Hairston, III Senior Vice President, Nuclear Operations Sw n to and subscribed efore me this 29th day of June, 1988.

Y

__O?ees

// / >

$Z uv flotary Pu'bl'ic '

HJB:ju c: Georaia Power Comoany Mr. P. D. Rice, Vice President and Vogtle Project Director Mr. G. Bockhold, Jr., General Manager - Plant Vogtle GO-NORMS U. S. Nuclear Regulatory Commission. Hashinaton D C_,.

Mr. J. B. Hopkins, Licensing Project Manager - Vogtle (2 copies)

U. S. Nuclear Regulatory Commission. Reaion II Dr. J. N. Grace, Regional Administrator Mr. J. F. Rogge, Senior Resident Inspector, Operations - Vogtle Mr. R. T. Schepen, Senior Resident Inspector, Construction - Vogtle l