ML20196L626
| ML20196L626 | |
| Person / Time | |
|---|---|
| Issue date: | 06/29/1988 |
| From: | Hagan T, Lee D NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), POWER SAFETY INTERNATIONAL |
| To: | |
| Shared Package | |
| ML20196L620 | List: |
| References | |
| CON-FIN-D-2177, CON-NRC-26-88-316 NUDOCS 8807080077 | |
| Download: ML20196L626 (2) | |
Text
- -
"*' Y # b,'
!. CON T R ACT 10 CODE P,.G t.
OF PAGES AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1
l 2
- 2. AMENOMENT/MOOlFICAT40N NO.
- 3. E F FECTIVE OAT E
- 4. REQUISITION [AJACHASE REQ. NO.
S. PROJECT NO. (if applicable)
One (1) 6-1-88 AED-88-316 ritd 6-1-88
- 6. ISSUED SY
- 7. ADMIN 15TEREO DY (1/ other then item 6) l US Nuclear Regulatory Commission Division of Contracts and Property Management Washington, D.C.
20555
- 8. N AME AND AOORE55 OF CONT RACTOR (No., street county, State and ZIP Code) g 9A. AMENOMENT OF SOLICIT ATION NO.
~
PowerSafety* International
- 90. DATED (SEE ITEM J J) 3315 Old Forest Road P.
O.
Box 11886 loa. MOOtFICATION OF CONT R ACT/ ORDER Lynchburg, VA 24506-1886 1
X NRC-26-88-316 Soe. OATEO (SEE ITEM JJ)
CODE l FACILITY CODE 1_2 5_ g g
- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in item 14. The hour and date specified for remipt of Offers is extendaj, is not em.
tencbd.
Of fers must acknowledge receipt of this arnendment prior to the hour and date specified in the solicitation or as amerded, by one of the 'ollowing rnethodo (s) By completing Items 8 and 15.and returning copies of the amendment: (b) By acknowledging receipt of this amendment on each copy of tho of fer tubmitted; or (c) By separate letter or telegram which includes a refererRe to the solicitation and amendmer:t numbers. FAILURE OF YOUR ACKNOW1 EDG.
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RE iULT l
lN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted,such change may be made by teleg sm or lattar, providnd each telegram or letter makes reference to the solicitation and this amendrnent, and is received prior to the opening hour and date specifier iS. ACCOUN TING AND APPROPRI ATION DAT A (1/ required)
- 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MOOlFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.
A. TH15 CHANGE OR DER 15 ISSUEO PURSUAN T TO: (Spectfy authority) THE CHANGES SET FORTH IN ITEM 14 ARE MAOC IN THE CON.
g T RACT ORDER NO. IN IT EM loa.
- 0. THE A00VE NUMDE REO CONTR ACT/ ORDER 15 MOOlFIED TO REFLECT THE ADMINISTR ATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PUR5UANT TO THE AUTHORITY OF FAR 43.103(0).
C. THIS SUPPLEMEN TAL AG REEMEN145 ENT EREO IN TO PURSU AN T TO AUTHORIT Y OF:
- 0. 01HE R (Speenly type of moditscetion end au thority) l X
Mutual agreement Of the parties.
E. IMPORTANT: Contractor is not, b is required to sign this document and return 1
copies to the issuing of fice.
55CRIPTBON OF AMENOMEN T/MOOlFICATSON (Ortentsed by UCFseetwn headings, including schettation/ contract subject matter where feasible.)
{
The purpose of this modification is to extend the required delivery date for simulator and to accept as consideration the items listed in the Contractor 's letter dated May 25, 1988, which j
is hereby incorporated by reference.
l Therefcre, the Contract is modified as shown on page 2 of this modification.
8807080077 880629 PDR CONTR NRC-26-88-316 PNU E xce
- as provided meteen, all terms and conditions of the document referenced in item 9A or 10A. as heretofore changed, remains unchanged and in tull force a nd ' tc t, 16A. N AME AND TIT LE OF CONT RACTINO OFFICER (Type or pnat/
i 15 A. ' AME AND TIT LE OF SIGNE R (Type on pnntJ
- 0. E. Lee President TimOt p*
CT 16C.O ESt>NED
,f I S H. CON T R AC T ' ;' ' FFEROR 15 OA T,15G N EO 160. 'Seff E p A<
Y o Lgn) l
, 'no t re oynfrdf Offacer)
{
(Sngnature<,o__
eu ru
)
STANDARD FORM 30 ( EV.10 8 31 NSN F54041152 407o 30 10 a, prescribed by G5A PREVIOUS EDITION UNUSABLE rna see erns sa n1 1'
y; r '. ) -
t I
Cont act No. NRC-26-88-316 Modification No.
1 Page 2 1.
Under~Section.F.3, Time of Delivery, pagragraph a.
is revised to read as follows:
"a.
simulator - shall be installed and Sully operational n later than June JG",
1988."
bl 2.
The Contractor shall provide the following items as consideration for extension of the above delivery date:
a.
Label the major panels of the simulator and install mimic striping to make it easier for the NRC to train on the simulator and easier for the students to understand the simulated control room and plant and its operations.
b.
Write.and supply to the NRC a supplemental instructor's operations manual that covers operations that were not clear or not developed in the existing instructo
's manual.
c.
Repair software simulation of the feedpumps to improve their response and dynamics.
d.
Modify the current simulation of the operation of the IEOTSG to support the new RCS model, e.
Repair the following hardware failures:
- Malfunctions in 6 CRT's
- Computer memory boards
- Panel meter movements
- Keypunch
- Replace 6 disk drive heads
- Magnetic tape drives f.
Correct errors in the computerized data book in the instructor's console.
o It is understood from telephone discussions between Sharon Bell of this office and Mr. Gene Chulick of Power Safety on May 31, 1988, that the labelling provided under 2.a.
above shall be professionally engraved or etched hard plastic permanent plates.
All other terms and conditions of the contract remain unchanged.
l l
l
-