ML20196L434
| ML20196L434 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/21/1988 |
| From: | Shawn Smith AFFILIATION NOT ASSIGNED |
| To: | NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| FRN-53FR16435, RULE-PR-50 53FR16435-01567, 53FR16435-1567, NUDOCS 8807070471 | |
| Download: ML20196L434 (1) | |
Text
' ' -
DOCKETNUMBER f
vR0 POSED ROLE bb b l
(63FR/6'/39'
/[67 m.i. i t.e UWFC
'88 JN 23 P8 :58 June 21,gg{4,,,',j,"((
BRANCW Secretary of the Commission Attn: Docketing and Services Branch U.S. Nuclear Regulatory Commission Washington, D.C.
20555 RE: SUPPORT OF NRC PROPOSED CLARIFICATION OF EMERGENCY PLANNING REQUIREMENTS FOR LOW POWER LICENSES
Dear Sir:
I am writing in support of the proposed rule raferenced above. When the proposed rule is past, I believe it will clear up any confusion regarding the requirements of the public notification system for low power testing.
I feel that the proposed rule would not decrease the operative capabili-ties of emergency planning and, in fact, will clarify the NRC's original intent regarding public notification requirements that must be met before low power testing.
I say "yes" proposed rule and "yes" to the opening of Seabrook Station.
Sincerely, h% O-g Shari L. Smith 30 Granite Post Green North Hampton, NH 03862
/ sis 8807070471 880621 53 16435 PDR
--