ML20196L411

From kanterella
Jump to navigation Jump to search
Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations
ML20196L411
Person / Time
Site: Seabrook  
Issue date: 06/22/1988
From: Seymour B
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR16435, RULE-PR-50 53FR16435-01539, 53FR16435-1539, NUDOCS 8807070448
Download: ML20196L411 (1)


Text

DOCKET llVMBER j

PROPOSED RUI.E R 5 o (53 F2 K Y 35)

[m [ r.

l q

'!hi.:

u Secretary,of the Commission

'88 JJN 23 P8 39 US Nuclear Regulatory Commission June 22, 1988 Washington, DC.

20555 0Fu.

.i si,a 00 CMC % ;

Eli A h tm I am writing to you as a resident of New England concerned with the energy needs of this area and of the nation as a whole.

The Seabrook project sits, ready to produce safe and reliable energy, and yet stymied by political opposition to emergency planning efforts.

Our energy needs will not lessen with time, and yet our cur:ent resources must. New England can benefit not only from the electrical energy provided by Seabrook Station, but from the existence of responsible emergency end evacuation plans as well.

I fully endorse the new proposed rule for public notification, and the low-power licensing of Seabrook Station.

O%

w d N.

M Bruce R. Seymou 4 Pine St.

Newmarket, N.H.

03857 8807070448 880622 PDR PR SO S3FR16435 PDR O S -/ 0