ML20196K795

From kanterella
Jump to navigation Jump to search
Comment Opposing Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations
ML20196K795
Person / Time
Site: Seabrook  
Issue date: 06/21/1988
From: Pelosi T
HAVERHILL, MA
To: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR16435, RULE-PR-50 53FR16435-01438, 53FR16435-1438, NUDOCS 8807070118
Download: ML20196K795 (2)


Text

00CTU liUMBEIT g gp a

t s# '

g PROPOSED RULE

~ J Iibf/4 City of Haverhill o Massachusetts (63 FR tid 3 5 __

A k.ed s tw E iE O

/gg

%j*snw'e/

Office of The Mayor use i

Theodore A. Pelosi, Jr.

'88 JJN 23 PSM] phone 617/374-2300 Mayor OFFIM <

.,L"71 00CKElibi SMhCH June 21, 1988 Mr. Samuel J.

Chilk Secretary of the Commission U.

S.

Nuclear Regulatory Commission 1717 H Street, N.W.

Washington, D.

C.

20555 Attention:

Docketing and Service Branch

Dear Secretary Chilk:

On May 9, 1988, the Nuclear Regulatory Commission (NCR) published a proposed change to its emergency planning requirements for fuel loading and low-power operation of nuclear power plants.

The proposed rule change would eliminate many existing low-power licensing requirements, including offsite emer-gency response plans, any public-notification systems (including sirens), and the training of offsite emergency response personnel.

As the Mayor of the City of Haverhill, Massachusetts, I vigorously oppose the proposed amendment to existing safety requirements.

The proposed rule has been developed with only the utility's interests in mind.

The NRC is once again moving to place the public at risk for the sole purpose of allowing Seabrook Station to obtain a low-power license, even though the ques-tion of whether it will ever be granted a full-power license is seriously in doubt.

8807070118 880621 PDR PR 50 53FR16435 PDR

' gg mec. 4 s-er street. Omo ss43

b f

j Mr. Samuel J.

Chilk Page two U.

S. Nuclear Regulatory Commission June 21, 1988 l

In the interest of public safety, I urge the Commission'to reject the proposed rule change.

All offsite emergency response planning requirements must be in place before 1

allowing any degree of risk to the public, including risks from low-power operation.

Very truly yours, I

Theodore A.

Pelosi, Jr.

MAYOR TAP /ch 1

l J 5-/o f\\

--,-,,--,-+.--,-c.

.