ML20196K704
| ML20196K704 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/23/1988 |
| From: | Hickok R AFFILIATION NOT ASSIGNED |
| To: | NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| FRN-53FR16435, RULE-PR-50 53FR16435-01219, 53FR16435-1219, NUDOCS 8807070082 | |
| Download: ML20196K704 (1) | |
Text
7,l,,f[E PE ST Ob Nucicar Op0 rational Services Corporation wg (65 P R M51)
Secretary of the Commission Attn: Docketing and Service Branch
((c' DSS.'tNil ea:.w U.S. Nuclear Regulatory Commission Washington, D.C. 20555 l
Dear Sirs; 1
1 l
Please proceed and adopt the proposed clarification of emergency plan-ning requirements for low power licensing to allow Seabrook Station to perform 5% testing.
Nuclear power is safe, clean, and reduces dependency on other forms of energy. I believe it is in our interest to have this industry regulated at the federai level by individuals with the technical knowledge to make the necessary decisions.
S erely
'Ll;a/t R
E Hickok President i
1 QS70gosa0s0623 50 53FR16435 PDR PO Box 1191 Seabrook, NH. 03874 603-895-4103 BS-/0 my gi;;5