ML20196K404
| ML20196K404 | |
| Person / Time | |
|---|---|
| Issue date: | 07/02/1999 |
| From: | Dudley R NRC (Affiliation Not Assigned) |
| To: | Masnik M NRC (Affiliation Not Assigned) |
| References | |
| PROJECT-689 NUDOCS 9907080316 | |
| Download: ML20196K404 (6) | |
Text
+
July 2,~1999 MEMORANDUM TO:. Michael T. Masnik, Chief Decommissioning Section Project Directorate IV & Decommissioning Division of Licensing Project Management FROM:
Richard F. Dudley, Senior Project Manager Original signed by RFD Decommissioning Section Project Directorate IV & Decommissioning Division of Licensing Project Management
SUBJECT:
FORTHCOMING WORKSHOP WITH THE NUCLEAR REGULATORY COMMISSION (NRC), THE NUCLEAR ENERGY INSTITUTE (NEI),
AND PUBLIC STAKEHOLDERS REGARDING A RISK-INFORMED APPROACH TO DECOMMISSIONING REGULATIONG DATE & TIME:
Thursday, July 15,1999, 8 a.m.-5 p.m.
Friday, July 16,1999, 8 a.m.-5 p.m.
LOCATION Holiday Inn Hotel 2 Montgomery Village Avenue j
Gaithersburg, MD 20879 PURPOSE:
To discuss decommissioning risk assessment activities associated with the Commission's efforts to establish a risk-informed approach to certain i
decommissioning regulations. (See attached draft agenda.)
l PARTICIPANTS:*
NRC NEI J. Zwolinski J.Hannon Mike Meisner j,
G. Holahan R. Barrett Alan Nelson, et al.
'//
S. Richards M. Masnik, et al.
hl
Attachment:
Draft Agenda Project No. 689 cc: See next page kh
$ ;; g,'l gg CONTACT: R. Dudley, NRR 301-415-1116
- Meetings between NRC technical statt and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" (59 Federal Registor 48340 9/20/94).
DISTRIBUTION: See attached list h//7 i
DOCUMENT NAME: G:\\PDIV-3\\NEl\\MTN_7-15.WPC TO RECEfVE A C'9V OF THIS DOCutfENT, IMOICATE IN THE BOX: "C" = COPY WITHOUT ENCLOS(IRES "E" e COPY WffH ENCLOSURES "N" I
PDh hDRIPRGED PDIV/LA PDIV-Disc OFFICE 1,(
I RDNy:ab sMagruder M CJamersmd/MMed /M NAME DATE 7 / M9 7 / 4 /99 '
7 /.2/99 b
)/ b/99 l
i (j b i i O ;)
OFFiclAL RECORD COPY 4907000316 990702 PDR REVGP ERGNUMRC PDR
~
' Nucle:r Energy Institut2 Project No. 689 cc:
. Mr. Ralph Beedle Ms. Lynnette Hendricks, Director j.
Senior Vice President Plant Support and Chief Nuclear Officer Nuclear Energy Instituta Nuclear Energy Institute Suite 400 Suite 400 -
1776 l Street, NW 1776 l Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director Mr. Charles B. Brinkman, Director Programs Washington Operations Nuclear Energy institute ABB-Combustion Engineering, Inc.
' Suite 400 '
12300 Twinbrook Parkway, Suite 330 1776 i Street, NW.
Rockville, MD 20852 Washington, DC 20006-3708 Mr. David Modeen, Director Mr. Michael Meisner Engineering.
Maine Yankee Atomic Power Co.
Nuclear Energy Institute 321 Old Ferry Road Suite 400 Wiscassett, ME 04578-4922 1776 l Street, NW Washington, DC 20006-3708 Mr. Ray Shadis Friends of the Coast Mr. Anthony Pietrangelo, Director P. O. Box 98 Licensing Edgecomb, ME 04556
. Nuclear Energy institute Suite 400 Mr. David Lochbaum 1776 i Street, NW Union of Concerned Scientists Washington, DC 20006-3708 1616 P St. N.W.
I Suite 310 Mr. Nicholas J. Liparuto, Manager Washington, DC 20036 j
Nuclear Safety and Regulatory Activities Nuclear and Advanced Technology Mr. Paul Gunter Division Nuclear Information Resource Service i
Westinghouse Electric Corporation 142416* St. N.W. - Suite 404 P.O. Box 355 Washington, DC 20036
)
Pittsburgh, PA 15230 i
Mr. Peter James Atherton Mr. Jim Davis, Director P.O. Box 2337 i
Operations Wehington, DC 20013 Nuclear Energy institute c
Suite 400 Mr. H. G. Brack 1776 l Street, NW Center of Biological Monitoring Washington, DC 20006-3708 P.O. Box 144 Hull's Cove, ME 04644 Mr. Paul Blanch Energy Consultant 135 Hyde Road West Hartford, CT 06117 i
?
DRAFT AGENDA FOR NRC/ INDUSTRY /PUBLIC WORKSHOP
" RISK-INFORMED BASIS FOR CERTAIN DECOMMISSIONING REGULATIONS" Day.1:
8:00-8:10am Open Meeting / introductions 8:10-8:30 am Opening Remarks (State Workshop mission, goals, and ground rules) 8:30-10:00am Dominant Sequences for Long-Term Mitigation Events Industry Discussion: Industry Approach to PRA for Decommissioning (45 min.)
NRC PRA Discussion: " Draft Technical Study on SFP Accidents for Decommissioning Plants"(45 min.)
10:00-10:10am Break 10:10-11:30am Dominant Sequences for Long-Term Mitigation Events Industry's Mitigation Activities: internal fire, LOOP, regulatory requirements, TSs, event recognition, notification, emergency response, training, and procedures (20 min.)
Open Discussion (1 hr.)
11:30-12:30pm Lunch 12:30-1:00pm Summary of NRC/ Industry /Public D:scussion on Long-Term Mitigation Events (define NRC/ Industry action items) 1:00-3:50pm Dominant Sequences for Intermediate Term Mitigation Events NRC PRA Discussion: " Draft Technical Study..."(45 min.)
Industry's Mitigation Activities: loss of coolant inventory, regulatory requirements, TSs, event recognition, notification, emergency response, training, and procedures (45 min.)
Open Discussion (1 hr. 20 min.)
3:50-4:00pm Break 4:00-4:30pm Summary of NRC/ industry /Public Discussion i
7.-
l l-on Intermediate-Term Mitigation Events (define NRC/ Industry action items) 4:30-5:00pm Day 1 Closing Remarks Day 2:
8:00-8:30am
- Opening Remarks / Overview of Day 1 8:30-10:20am Seismic Discussion NRC Discussion: " Draft Technical Study" (45 min.)
Industry Discussion: Alternate methods of calculating seismic risk, draft EPRI Technical Report (45 min.)
Open Discussion (20 min.)
10:20-10:30am Break 10:30-11:30am Seismic Discussion Industry's Mitigation Activities: regulatory requirements, TSs, event recognition, notification, emergency response, training, and procedures (30 min.)
Open Discussion (30 min.)
'11:30-12:00pm Summary of NRC/ industry /Public Discussion on Seismic (define NRC/ industry action items) 12:00-1:00pm Lunch CONCURRENT SESSIONS ON HEA VY LOADS AND THERMAL HYDRAULICS 1:00-2:30pm Heavy Loads Discussion NRC PRA Discussion: " Draft Technical Study..." (30 min.)
Industry's Mitigation Activities: regulatory requirements, TSs, event recognition, notification, emergency response, training, and procedures (30 min.)
Open Discussion (30 min.)
AND l
l 1:00 2:30pm Thermal Hydraulics Discussion NRC Discussion: " Draft Technical Study..." (30 min.)
Industry Discussion: Thermal hydraulics issues (30 min.)
Open Discussion: Approaches, methods, and assumptions for spent fuel hectup analyses (30 min.)
l 1
e l'
L ALL WORKSHOP PARTICIPANTS 2:30-2:45pm Break
. 2:45-3:00pm Summary of NRC/ Industry /Public Discussion on Heavy Loads (define NRC/ Industry action items) 3:00-3:15pm Sn.' mary of NRC/ Industry /Public Discussion on Thermal Hydraulics (define NRC/ industry action items) 3:15-4:00pm Planning for Followup Activities 4:00-Adjourn C!osing Remarks on Workshop Since this is a working meeting, the industry, the public, and the NRC are welcome to participate in the open discussions.
i s.a.
DISTRIBUTION FOR NUCLEAR ENERGY INSTITUTE MEETING NOTICE DATED: July 2,1999 Hard Copy l Central Files PUBLIC PDIV-D R/F OGC l
ACNW/ACRS i
MMasnik SMagruder RDudley Receptionist (OWFN and TWFN)
E-Mail SCollins/RZimmerman BSheron WKane JZwolinski/SBlack DMatthews i
SRichards GTracy i
JHickey, NMSS CACarpenter TJohnson, NMSS CPoslusny, NMSS OPA PMNS (Meeting Announcement Coordinator)
JRutberg WReckley JHannon VOrdaz CJamerson RBarrett MFairtile TFredrichs PHarris JHickman WHufl man JMinns SNalluswami Pray DScaletti i
LThonus MWebb STreby, OGC l
MMalloy AMarkley 1