ML20196J973

From kanterella
Jump to navigation Jump to search
Forwards 1987 Annual Plant Mod Rept,Per 10CFR50.59, Describing Changes Made to Facility & Procedures
ML20196J973
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/30/1988
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20196J978 List:
References
NUDOCS 8807060489
Download: ML20196J973 (1)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _

l' PHILADELPHIA ELELTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 12151841 4000 June 30, 1988 Docket Nos. 50-277 50-278 Mr. William T. Russell, Administrator U. S. Nuclear Regulatory Commission Region I Attn: Document Control Desk Washington, D. C. 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 1987 Annual Plant Modification Report Pursuant to 10 CFR 50.59

Dear Mr. Russell:

Enclosed is the 1987 Annual Plant Modification Report for Peach Atomic Power Station Units 2 and 3 operated under Facility Operating Licenses DPR-44 and DPR-56, respectively.

This report is being submitted pursuant to the reporting requirements of 10 CFR 50.59 to describe changes made to the facility and procedures as described in the Updated Final Safety Analysis Report.

Very truly yours, b ~

W. M. Alden Director Licensing Section Nuclear Support Division Attachments cc: Addressee T. P. Johnsoil, USNRC Senior Resident Inspector gg R. E. Martin, Project Manager, USNRC p T. E. Magette, State of Maryland i jO 880630 P 05000277 PNu