ML20196J719
| ML20196J719 | |
| Person / Time | |
|---|---|
| Issue date: | 12/07/1998 |
| From: | Stewart Magruder NRC (Affiliation Not Assigned) |
| To: | Essig T NRC (Affiliation Not Assigned) |
| References | |
| PROJECT-689 NUDOCS 9812110003 | |
| Download: ML20196J719 (5) | |
Text
'
December 7, 19981 MEMORANDUM TO: Thomts H. 'Essig, Acting Chief I
Generic lasues and Environmental Projects Branch
- Division of Reactor Program Management i
i Office of Nuclear Reactor Regulation s'
FROM:
' Stewart L. Magruder, Project Manager Original Signed By:
Generic lasues and Environmental Projects Branch l
Division of Reactor Program Management Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI)
REGARDING FIRE PROTECTION FUNCTIONAL INSPECTIONS AND l
FIRE-INDUCED CIRCUlT FAILURE ANALYTICAL ASSUMPTIONS
. DATE AND TIME:
December 14,1998 2:30 p.m. - 4:30 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission l
One White Flint North i
11555 Rockville Pike Rockville, Maryland 20852 y
Room O-1684 PURPOSE:
To discuss fire protection functional inspection pilot program follow-on activities and fire-induced circuit failure analytical assumptions. A l
proposed agenda is attached.
i PARTICIPANTS:
NBC INDUSTRY
.l T. Marsh F. Emerson (NEI)
S. West D. Modeen (NEI), et al.
L. Whitney l
P. Madden, et al.
l Project No. 689 i
Attachment:
Agenda I
cc w/att: See next page l
Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant j
to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Register j
48344,9/20/94.. Members of the public who wish to attend should contact Leon Whitney at (301) 415-3081 or lewi@nrc. gov.
i w
Distnbution: See next page DOCUMENT: G:\\simi\\ mig 1214.98 l
SCMpfb
)
OFFICE PGEB SC:SPLB o
NAME-SMagruder:sw# SWest h FAksttAewicz DATE k /98 dD}/98
/98 ypc,J j
_no%
l 9812110003 991207 mgpg maqM fpggj PDR REV9P ER DU E b
- - " U J'l J DR p M/
^
REnttw
=
O usu
.p "t-UNITED STATES y
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30886 0001 I
December 7, 1998 r
MEMORANDUM TO: Thomas H. Essig, Acting Chief '
Generic lasues and Environmental Projects Branch l
Division of Reactor Program Management Office of Nuclear Reactor Regulation.
FROM:
. Stewart L. Magruder, Project Manager ;hA 1 %
Generic lasues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation j
SUBJECT:
NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI)
REGARDING FIRE PROTECTION FUNCTIONAL INSPECTIONS AND FIRE-INDUCED CIRCUlT FAILURE ANALYTICAL ASSUMPTIONS DATE AND TIME:
December 14,1998 l
2:30 p.m. - 4:30 p.m.
i LOCATION:
U.S. Nuclear Regulatory Commission l
One White Flint North i
11555 Rockville Pike Rockville, Maryland 20852 Room O-16B4 l
PURPOSE:
To discuss fire protection functional inspection pilot program follow-on activities and fire-induced circuit failure analytical assumptions. A proposed agenda is attached, j
PARTICIPANTS:
NflQ INDUSTRY T. Marsh F. Emerson (NEl)
S. West D. Modeen (NEI), et al.
L. Whitney P. Madden, et al.
Project No. 689
Attachment:
Agenda cc w/att: See next page Meetings between the NRC technical staff and applicants or licensees are open for intsrested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Register 48344, 9/20/94. Members of the public who wish to attend should contact Leon Whitney at (301) 415-3081 or lewi@nrc. gov.
]
MEETING AGENDA
)
NEl/NRC FIRE PROTECTION FUNCTIONAL INSPECTION PILOT PROGRAM FOLLOW-ON ACTIVITIES, AND DISCUSSION OF FIRE-INDUCED CIRCUIT FAILURE ASSUMPTIONS FOR VARIOUS CABLE CONFIGURATIONS DECEMBER 14,1998 2:30-2:45 Discussion of NEl and NRC Perceived Strengths and Weaknesses of the Pilot FPFI Inspections
)
j 2:45-3:15 Presentation of NEl Licensee Self-assessment Review Proposal 3:15 - 3:30 Break 3:30 - 4:00 NRC Feedback on NEl Proposal!Open Discussion of All Possible Follow-on Options i
4:00 -4:30 Electrical Cable Configurations and Related Fire-idut?A Hot Short Analytical Assumptions i
i e
Attachment
-o Nuclear Energy. Institute Project No. 689 cc:
Mr. Ralph Beedle Ms. Lynnette Hendricks, Director Senior Vice President Plant Support and Chief Nuclear Officer Nuclear Energy institute Nuclear Energy Institute Suite 400 1
l Suite 400 1776 i Street, NW 1776 l Street NW Washington, DC 20006 3708 Washington, DC 20006-3708 Mr Alex Marion, Director Mr. Charles B. Brinkman, Director Programs Washington Operations Nuclear Energy Institute ABB-Combustion Engineering, Inc.-
Suite 400 12300 Twinbrook Parkway, Suite 330
- 1776 l Street, NW Rockville, Maryland 20852 Washingion, DC 20006-3708 Mr. David Modeen, Director Engineering Nuclear Energy Institute Suite 400 1776 i Street, NW Washington, DC 20006-3708 Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy Institute
)
Suite 400 1776 i Street, NW
- Washington, DC 26006-3708 Mr. Nicholas J. Liparulo, Manager j
Neclear Safety and Regulatory Activities Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.0, Box 355 Pittsburgh, Pennsylvania 15230 l
Mr. Jim Davis, Director Operations Nuclear Energy institute i
Suite 400 1776 l Street, NW Washington, DC 20006-3708
.4<
s-l M
)
i
.,3 Distnbution: Mtg' Notice w/NEl Dated ' December 7, '1998 '
Hard Cooy Project Files Central Files iJ PUBLIC.
PGEB R/F OGC-l ACRS SMagruder LWhitney OWFN Receptionist EMad
]
' SCollins/RZimmerman BSheron i
BBoger JRoe 1
DMatthews i
j i -
FAkstulewicz SMagruder LGTracy, OEDO i-PMNS 4
.OPA GHolahan TMarsh.
SWest LWhitney i
RBarrett
. AEl-Bassioni SWong JHyslop.
JSingh, ACRS NSiu, RES RJenkins WRuland, Rl ABelisle, Ril RGardner, Rill TStetka, RIV PHarrell, RIV 1
.