MaineYankee RELIABLE ELECTRICITY SINCE 1972 329 BATH ROAD
- BRUNSWICK, MAINE 04011 * (207) 798-4100
~
July 30,1997
.MN-97-88 JRH-97-188 I
UNITED STATES NUCLEAR REGULATORY COMMISSION Attention: Document Control Desk Washington, DC 20555
References:
(a)
License No. DPR-36 (Docket No. 50-309)
(b)
Letter, USNRC to Maine Yankee," Request for Additional Information (TAC NO. M95380)", July 16,1997.
Subject:
RAI - Steam Generator Pressure Assumed in Small Break LOCA Analysis Gentlemen:
L In Reference (b) your staffissued a request for additional information (RAI) on our initial steam generator secondary side pressure assumptions for a small break LOCA. The purpose of this letter l
is to respond to the RAI.
Maine Yankee's response is enclosed. We trust that the information in this letter is satisfactory.
Please contact me if you have any questions.
Very truly yours, Q,
iebert, Manager l
Regulatory Affairs Department i
f l
Enclosure c: Mr. H. J. Miller Mr. D. H. Dorman Mr. J. T. Yerokun Mr. Patrick J. Dostie Mr. Uldis Vanags 9700050017 970730 PDR ADOCK 05000309 P
- PDR, 050017
O' 1
Maine Yankee Response to Request for AdditionalInformation Steam Generator Pressure Assumption for SBLOCA i
NRC OUESTION Provide the steam generator secondary side pressure assumed in the SBLOCA analyses of record for MYAPS for fuel cycle 4 and all subsequent fuel cycles.
M AINE YANKEE RESPONSE l
The small break LOCA analysis performed by Combustion Engineering (CE) for Cycle 4 l
remained the analysis of record through approximately the middle of Cycle 13. During Cycle 13, Yankee Atomic Electric Company re-analyzed the small break LOCA and considered an expanded range ofinitial steam generator pressure. During Cycle 15, the Cycle 4 CE analysis was reinstated c.s the analysis of record but with an evaluation of the changes to the analysis i
assumptions to reflect Cycle 15 operation. For Cycle 16, the proposed Siemens Corporation analysis, currently under NRC review, considers a range of operating pressure. The steam generator secondary side pressure assumptions for Cycle 4 and all subsequent cycles are summarized below.
l
SUMMARY
OF SG PRESSURE ASSUMPTIONS FOR SBLOCA Cycle (s)
SG Dome Reference for Analysis of Record Pressure (psia) i Cycles 4-13 a
~877' Reference 1 Cycles 13 a-15,a 750 References 2 and 3 l
Cycle 15 a -15 755 Reference 4 Cycle 16 750 Reference 5 (proposed Siemens)
CE provided a plot of the steam generator pressure response for the analysis described in Reference 1.
Please note that in Reference 4 we incorrectly reported an initial steam generator pressure of 835
. psig in Table 3.3. The correct value is 877 psig.
I
7
.y REFERENCES 1.
Letter, W. P. Johnson (MY) to USNRC '"Small Break LOCA Analysis," WMY 77-87, September 22,1977.
2.
YAEC-1868 Rev. 0," Maine Yankee Small Break LOCA Analysis", June 1993.
3.
Letter, J. R. Hebert (MY) to W. T. Russell (USNRC), " Submittal of Additional RELAP5YA SBLOCA Information for Maine Yankee", MN 96-018, February 21,1996, transmitting YAEC-1868 Rev.1," Maine Yankee Small Break LOCA Analysis", January 1996.
4.
Letter, C. D. Frizzle (MY) to W. T. Russell (USNRC), " Response to Order and Demand for Information", MN 96-02, January 10,1996.
5.
Letter, C. D. Frizzle (MY) to W. T. Russell (USNRC), " Submittal of Maine Yankee SBLOCA Licensing Analysis in Compliance with 10 CFR 50.46 and in Satisfaction of TMI Action Items II.K.3.30, II.K.3.31 and II.K.3.5", MN 96-056, April 25,1996.