Submits 120-day Response to NRC GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations
ML20196H923
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/30/1997
From: Phelps R
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-01, GL-97-1, LIC-97-123, NUDOCS 9708010133
Download: ML20196H923 (3)


Text

.-

998 Omaha Public PowerDistrict 444 South 16th Street Mall Omaha NE 68102-2247 l

l July 30, 1997 LIC-97-123 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, D.C.

20555-0001

References:

1.

Docket No. 50-285 2.

NRC Generic Letter 97-01, " Degradation of Control Rod Drive Mechanism Nozzle and Other Vessel Closure Head Penetrations,' dated April 1, 1997 3.

Letter from OPPD (S. K. Gambhir) to NRC (Document Control Desk) dated April 30, 1997 (LIC-97-065) 4.

Letter from CE0G (D. F. Pilmer) to NRC (Document Control Desk) dated July 25, 1997 (CE0G-97-244)

SUBJECT:

120-day Response to NRC Generic Letter 97-01 Generic Letter (GL) 97-01 requested addressees within 120 days to (1) describe their past and planned programs for inspection of PWR control rod drive mechanism (CRDM) and other vessel closure head penetrations, and (2) provide a history of abnormal plant primary system chemistry information, including a description of actual or indicated resin bead intrusions which have exceeded chemistry guidelines.

Omaha Public Power District (OPPD) has participated with the Combustion Engineering Owners Group (CEOG) program in addressing the requests in GL 97-01. The CEOG submitted to the NRC, on behalf of CEOG members, CE NPSE-1085, CEOG Response to NRC (ieneric Letter 97-01, Degradation of CEDM Nozzle and Other Vessel Closure Head Penetrations (Referenc+

4).

This report incorporates the information for Fort Calhoun Station necessary to 1

address GL 97-01.

l l

This response is provided under oath as required by GL 97-01. Please contact me if you have any questions, Sincerely, g

Ao75 l

l e

R. L. Phelps Manager - Station Emineering Nuclear Illl0lllWilllllllHillWillllllllkill 9708010133 970730

"^

PDR ADOCK 05000285 P

PDR 45.5124 Etnployment with Equal Opportunny

4 U. S. Nuclear Regulatory Commission J

i LIC-97-123 Page 2 TCM/tcm l

Attachment c:

Winston & Strawn E. W. Merschoff, NRC Regional Administrator, Region IV l

L. R. Wharton, NRC Project Manager W. C. Walker, NRC Senior Resident Inspector 1

)

I

a-LIC-97-123 Attachment UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

Omaha Public Power District

)

Docket No. 50-285 (Fort Calhoun Station

)

Unit No. 1)

)

AEEIDAVII R. L Phelps, being duly sworn, hereby deposes and says that he is the Manager - Station Engineering Nuclear of the Omaha Public Power District; that as such he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached information concerning response to the requirements of NRC Generic Letter 97-01; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.

/

e R. L. Phelps Manager - Station Engineering Nuclear i

l l

STATE OF NEBRASKA) l

) ss COUNTY OF DOUGLAS) l Subscribed 4nd sworn to before me, a Notary Public in and for the State of Nebraska on this 3 0__ day of Juiy, 1997.

GENERM NOM W"I H*"I*

b i _ -.__

p g,to~

IE Ao il4 W __;

Notary Public