Submits Supplemental Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.Structural Mods Required Completed W/Exception of Open Insp Issues & Lighting Conduit Supports Evaluated
ML20196H815
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/01/1988
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-54, TXX-88544, NUDOCS 8807060254
Download: ML20196H815 (1)


Text

..

p J,

E=

Log # TXX-88544 r7 File # 10110 r-903.7 r'

C Ref. # 10CFR50.55(e) 1UELECTRIC July 1, 1988 wnn c.co. u Execulow hke besident U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20055

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 ORIGINAL DESIGN OF CONTROL ROOM CEILING SDAR:

CP-86-54 (SUPPLEMENTAL REPORT)

Gentlemen:

On October 3,1986, we notified you by cv letter logged TXX-6007 of a deficiency involving the design and insta.lation of the control room ceiling which we deemed reportable under the p.ovisions of 10CFR50.55(e). Our latest report on this-issue, logged TXX-88371, was submitted March 30, 1988. This report is submitted to clarify and status corrective actions completed to date.

The structural modifications required as a result of Corrective Action Program (CAP) validation activities have been completed with the exception of open inspection issues. The engineering evaluation of lighting and conduit supports including associated construction rework is necessary because of SDAR CP-85-36, "Train C Conduit Supports." This work was discussed in previous correspondence (TXX-88207 and TXX-88371) on SDAR CP-86-54 because it impucted complete installation of the new ceiling. The evaluation of lighting and conduit supports (impacting the control room ceiling) under SDAR CP-85-36 was completed by May 31, 1988. The associated construction rework for SDAR CP-85-36 will be completed consistent ws:h the PCHVP as discussed in correspondence on that SDAR. No further reports related to SDAR CP-86-54 are anticipated.

Very truly yours, W. G. W W. G. Counsil h!bD By:

s D. R. Woodlan Docket Licensing Manager RLA/grr c-Mr. R. D. Martin, Region IV gg}0 Resident Inspectors, CPSES (3) 7 1

1 0 400 North Okt Stren LB 81 Dallat. Texas 75.NI