ML20196H463
| ML20196H463 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 12/03/1998 |
| From: | Vandergrift J ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| OCAN129804, NUDOCS 9812090083 | |
| Download: ML20196H463 (3) | |
Text
_. _
. _ - - ~ ~ _ _. ~
.. _ _. _. ~ _. _. ~. _.. _. _. =. _
4 f
Ent rgy Operttions,Inc.
.L2N. fLh 1448 SR 333 1
Rzsdtdo. AR 72801 Tel501358-5000 i
i i
December 3,1998 OCAN129804 1
l U. S.' Nuclear Regulatory Commission Document Control Desk Mail Station OPl-17 i
Washington, DC 20555
)
l
Subject:
Arkansas Nuclear One - Units I and 2 Docket Nos. 50-313 and 50-368 l
Correction To Proposed Control Room Ventilation Technical Speci6 cation i
Changes' Gentlemen:
i l
By letter dated April 4,1995 (0CAN049501), Entergy Operations proposed technical specification (TS) changes to the requirements associated with the Arkansas Nuclear One -
l Unit I and Unit 2 (ANO-1 and ANO-2) control room emergency ventilation systems. This submittal was superseded by a submittal dated December 19,1996 (OCAN129603), and supplemented by a submittal dated /mgust 6,1998 (OCAN089801).
On page 7 of the attachment to our December 19,1996, submittal, a table intended as an aid to the reviewer in determining the new locations of previously specified surveillance information was provided. This table is inconsistent with the discussions of the ANO-1 surveillance requirements that are contained in the same attechment which properly characterize the new locations of this infonnation. Therefore, the following table has been revised to resect the corrected surveillaire references Current Reauirement Proposed Surveillance Reauirement 3.9.1.a 4.10.2.b.1,4.10.2.e, and 4.10.2.f 3.9.1.b 4.10.2.b.2 and 4.10.2.c I
3.9.1.c 4.10.2.b.3 3.9.1.d 4.10.2.d.1 o) 3.9.1.f 4.10.2.d.2 9812090083 981203 T i
PDR ADOCK 05000313; p
PDR h l
!~
- U. S. NRC December 3,1998 OCAN129804 Page 2 As this letter cor,ects information contained in our previous submittal and does not introduce
- any new information, Entergy Operations has determined that the no significant hazards j
considerations evaluated in our Decen6er.19,1996, submittal remain bounding. Should you have any questions on this submittal, please contact me.
l Very truly yours, 1
Ji y D. Vander.
Director, Nuclear Safety JDV/cws l
l l
l l
l U. S. NRC 4
December 3,1998 i
OCAN129804 Page 3
' *cc:
- Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission RegionIV l
611 Ryan Plaza Drive, Suite 400 l
Arlington, TX 76011-8064 l
NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 LW AR 72847 Mr. Nick Hilton NRR Project Manager RegionIV/ANO-1 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-h-3 One White Flint North 11555 Rockville Pike RockvGle, MD 20852 Mr. Chris Nolan NRR Project Manager RegionIV/ANO-2 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 1
11555 Rockville Pike Rockville, MD 20852 l
{
4 f
?