Forwards Second Revised Version of Rev 20 to Operational QA Plan. Revised Version of Rev 20 Previously Submitted on 961219 to Address NRC Concerns
ML20196H102
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 07/14/1997
From: Richard Anderson
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196H106 List:
References
NUDOCS 9707230332
Download: ML20196H102 (2)


Text

__

Northern states Power company 414 Nicollet Mall, RsQ 8 Minneapolis, MN 55401 i

Telephone (612) 337-2050 i

July 14,1997 10 CFR 50 Section 50.54(a)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 i

MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License No. DPR-42 50-306 DPR-60 Submittal of Second Revised Version of Operation Quality Assurance Plan (OQAP) Revision 20

)

Pursuant to 10 CFR 50 Section 50.54(a), this second revised version of Revision 20 l

to the Northern States Power Company Operational Quality Assurance Plan (OQAP) is submitted. A revised version of Revision 20 was previously submitted on December 19,1996 to address NRC concerns. This second revised version of the OQAP relocates Prairie Island Technical Specification procedure requirements (old Section 6.5.A) to the OQAP Section 7. These changes are in support of the license amendment request entitled, "Conformance of Administrative Control Section 6 to the Guidance of Standard Technical Specifications", dated December 14,1995.

This revised version completely supersedes the previous versions of Revision 20.

The changes included in this second revised version of Revision 20 do not reduce the commitments in the quality assurance program previously accepted by the NRC.

The basis for this conclusion is provided by Appendix D of the enclosure. Although not required by regulation, Revision 20 will not be implemented until approval has been obtained from NRC NRR.

lll$!!$Ibb{!I$0,!!!!

9707230332 970714

    • i*

PDR ADOCK 05000263 P

PDR

USNRC 7/14/97

- Page 2 of 2 l

i Please call Dale Vincent at 612-388-1121 or John Mestad at 612-337-2208 if there -

are any questions.

7)Wk vH W R6ger O Anderson -

Director Nuclear Energy Engineering encl: 1.

- c:

Regional Administrator-Ill, NRC NRR Project Manager (Monticello), NRC NRR Project Manager (Prairie Island), NRC

. Resident inspector (Monticello), NRC Resident inspector (Prairie Island), NRC State of Minnesota Attni Kris Sanda J Silberg i