Order.* Advises That Commission Will Not Review Aslab 880425 Memorandum & Order ALAB-891 & Directs Board to Determine Remanded Coaxial Cable Issue Needs to Be Resolved Before Low Power Operations.Served on 880629
ML20196H036
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/29/1988
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To:
Atomic Safety and Licensing Board Panel
References
CON-#388-6640 ALAB-891, OL-1, NUDOCS 8807060076
Download: ML20196H036 (2)


Text

- _ _ _ _ _ _ _ _ .

bd f0'

a n UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION W JLN 29 All:50 COMMISS10NERS: OFF!ct . - -. : ., ..

00CEim.,/,S.v;a Lando W. Zech, Jr., Chairman Thomas M. Roberts Kenneth M. Carr Kenneth C. Rogers SERVED JUN 291988 In the Matter of PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE, ET AL.

Docket Nos. 50-443-0L-1 50-444-OL-1 (Seabrook Station, Units 1 (Onsite Emergency Planning and 2) ) and Safety Issues)

ORDER The Connission will not review the April 25, 1988 Memorandum and Order of the Appeal Board, ALAB-891; howevu, the Comission directs the Licensing Board to determine whether the remanded coexial cable issue need be resolved before low-power operations.

In ALAB-891, the Appeal Coard indicated that the Licensing Board should net deternine at this time whether the remanded coaxial cable issue need be resolved before low-power operations. The Appesi Board believed a determination was unnecessary now because pendency o' the public notification issue, which it had remanded in ALAB-583, currently precludes low-pou r operations and because liti3ation of that issue gives no indication of being brief. ALAB-891, slip op. at 26 n.66.

There is a pending rulemaking regarding errergency planning requirements for low-power operations. See 53 Fed. Les 15435(1988).

IDo[p05o 880629 pg3.

j3dk

The coment period has concluded. The rule, as proposed, has the potential to remove the public notification issue as an obstacle to low power, wnich could possibly leave the coaxial cable issue as the sole issue before the Licensing Board for onsite emergency plar.ning and safety issues. Thus, the Commission bclieves that the Licensing Board should promptly initiate the process by which it will make the directed de termination.

) It is so ORDERED.

F,rtheCommtsion 3 Drag le 5

>5AMUELJL .

C1flLK Secretary of the Comission DatedatW$s$Tn on, D.C.

this ' ay of June, 1988