1 e ^
0
\\
~
B o etors Er k nes Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 December 1,1998 BECo Ltr. 2.98.155 U.S. Nuclear Regulatory Commission 60 '
ATTN: Document Control Desk l
Washington, DC 20555-0001 Notification of Chanae in Corrective Action Completion Dates
References:
A. BECo letter 2.98.070, dated May 27,1998," Reply to Notice of Violation and Proposed imposition of Civil Penalty - $165,000 and Payment of Civil Penalty" I
B. NRC letter dated April 27,1998," Notice of Violation and Proposed imposition of Civil Penalty - $165,000; and Exercise of Enforcement Discretion" This letter provides notification of changes in completion dates for the following actions described in Pilgrim Station's reference A response to NRC Notice of Violation tid Proposed imposition of Civil Penalty letter (reference B).
Violation 1.B, corrective action to prevent recurrence, "I&C and Electrical Engineering Department design guides wiP be revised to provide guidance on digital upgrades, in addition, NE3.08," Specifications and Reports," will be revised to ensure the appropriate requirements for l
digital upgrades are included in procurement documents."
i Completion date revised to December 30,1998.
I
\\
Violation 1.C.5, corrective action to preclude recurrence, D
7 "PS-79 is being revised to incorporate the additional loads identified as a a result of the violation."
Completion date revised to March 01,1999.
9912000173 981201 ADOCK 05000293 $[?
J PDR h
G PM I
I; 8 f i t
- f D 4
e
e We have apprised the NRC resident inspectors of these changes in more detail as part of the routine interface activity. Should you require further information, please do not hesitate to contact me.
[
l
. Alexan uclear Assessment Group Manager E
'JFA/bjt 298155 cc: Region i Administrator Sr. Resident inspector U.S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station 475 Allendale Road King of Prussia, PA 19406 Mr. Alan B. Wang, Project Manager Project Directorate 1-3 Office of Nuclear Reactor Regulation Mail Stop: OWFN 14B20 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 l