ML20196G376

From kanterella
Jump to navigation Jump to search
Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations
ML20196G376
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/22/1988
From: Ash S
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR16435, RULE-PR-50 53FR16435-01212, 53FR16435-1212, NUDOCS 8807050509
Download: ML20196G376 (1)


Text

_ _ _ _ _ _ _ _

.., .m nuwetR

/.2 / a

..costo putt _.g *g l

(Ss pp ikVM WF 88 3 23 P6 30 95 Flavell Road '

Groton, MA 01450 June 22, 1988 QI uO k gg

..Ui I g g';,

Secretary of the Commission Attn: Docketing a i Service Branch U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ,

Dear Cir:

I am writing to urge the NRC to adopt the proposed rule change regarding low power licensing requirements.

I believe that Seabrook has more than adequately demonstrated that it is qualified to operate at low power and can do so safely. The endless disputes over emergency planning for 5% operation are really political disputes, not safety disputes.

Please enact the proposed change so that Seabrook can proceed to the next phase of licensing. New England needs the power and Seabrook is long overdue to provide it.

Sincerely,

. _- l lJQ Sheryl Ash 1

8807050509 880622 PDR PR 50 53FR16435 PDR 05-/o