ML20196G356
| ML20196G356 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/26/1988 |
| From: | Mcdonald R ALABAMA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20196G360 | List: |
| References | |
| NUDOCS 8803080266 | |
| Download: ML20196G356 (1) | |
Text
_
y Alab ma Power Company 600 North 18th Strast Post office Box 264f Birmingham. Alabama 35291-0400 Telephone 205 250-1835 u
R. P. McDonaW Senior Vice President Alabama Power tte sxxthern ekctic system Docket No. 50-364 e
February 26, 1988 U. S. Nuclear Regulatory Comissiot Attention: Document Control Desk washingMn, D. C.
20555 Gentlemen:
Joseph M. Farley Nuclear Plant - Unit 2 Interval 1/ Period 2/ outage 3 Inservice Inspection Report Pursuant to the requirements of 10CFR50.55a(g) Alabama Power Company herewith submits the Joseph M. Farley Nuclear Plant Unit 2 Interval 1/
Period 2/ Outage 3 Inservice Inspection Report. This report describes and sumarizes the inservice inspection activities performed during the Unit 2 fifth refueling outage. These activities were completed on November 30, 1987.
Other pertinent report information, including as applicable, examination plans and schedules, examination results and reports, examination methods and procedures, evaluation of results, and corrective actions and repairs, is available at Farley Nuclear Plant for your review.
Respectively submitted, d.b. lcirw$W R. P. Mcdonald RPM / CDP:csl-V3 Enclosure cc:
Mr. L. B. Long Dr. J. N. Grace, w/1 enclosure Mr. E. A. Reeves Mr. W. H. Bradford 8803000266 080226
)
PDR ADOCK 05000364 G
PDR A