Forwards Oversight Plan for Independent Third Party Oversight Program as Required by NRC Order of 961024 to Util.Activities Are Continuing as Required by Order & Contained in Oversight Plan
ML20196G059
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/02/1997
From: Beck J
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196G063 List:
References
ITPOP-97-0005, ITPOP-97-5, NUDOCS 9705130375
Download: ML20196G059 (2)


Text

,

J*

j Little llarbor Consultants, Inc.

Millstone - ITPOP Project Office P.O. Box 0630 Niantic, Connecticut 06357-0630 Telephone 860-447-1791, ett 5966 Fax 866-444-5758 May 2,1997 Docket Nos. 50-245 50-136 1

50-423 ITPOP 97-0005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 j

Millstone Nuclear Power Station, Unit Nos.1,2, and 3 Enclosed with this letter is the Oversight Plan (the Plan) for the Independent Third Party i

Oversight Program (ITPOP) as required by the NRC Order of October 24,1996, to Northeast Nuclear Energy Company (NNECo).

We also want to advise the NRC that in support of our preparation of this Plan we are continuing to work on activities required by the Order and contained in the Oversight Plan. We are doing so cognizant of the fact that should the fm' al NRC approved Oversight Plan differ in any relevant

]

respect with the enclosed Plan, that such current activity may require future modi 6 cation in order to fully comply with the Gnal, approved Plan.

The speciGc activities we are or have been pursuing include outreach to the community, seeking input and understanding expectations of stakeholders regarding the Plan, evaluating the Comprehensive Plan submitted by NNECo to the NRC, developing structured interview and

.rurvey methodology, evaluating previous surveys at the Millstone site, attending public meetings, i

and starting our programmatic evaluation of the Millstone ECP.

I 9705130375 970502 h

PDR ADOCK 05000245.

P PDR l.ifI.l ll l.ill.lilli.ll.ll l

l l

$. b U.S. Nuclear Regulatory Commission ITPOP 97-0005, Page 2 4

All of our activities thus far have been in either direct support of our Oversight Plan development,.

4 general mobilization of the ITPOP team, or the early stages of Plan implementation.

i.

Very truly yours, W.

f

=

Dohn W. Beck, President j

Enclosure:

Oversight Plan l

1 cc:

W.D. Travers, NRC P. F. McKee, N'RC H. N. Pastis, NRC 3

W. D. Lanning, N~RC l

D. M. Goebel, NNECo P. Loftus, NNECo E. V. Fries, NNECo i

W. L. Temple, NNECo a

1 Y

1