Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations
ML20196F872
Person / Time
Site: Seabrook  
Issue date: 06/22/1988
From: Curry D
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR16435, RULE-PR-50 53FR16435-01364, 53FR16435-1364, NUDOCS 8807050343
Download: ML20196F872 (1)


Text

_ _ ______.___ _ _-___,_ -

/EE 002EIiiu.'SER g g PROPOSED RULE Donald E. Curry R.D. #1 Box 443

' ~ ~

G3 FR / Gc/30 Fremont, u.a.

03044

a ui-June 22, 1988 W*'

'N M 23 P7.58 Secretary of the Commission Attn Docketing and Service Branch U.S. Nuclear Regulatory Commission 0F4u..

Washington, D.C.

20555 00CKUHG. liev iCl Brut >

Dear Sirs:

I am writing in support of the continued licensing process for Seabrook Station.

Seabrook Station has been designed with all the latest technology for asauring safe operation of the plant and the staff consists of highly trained professionals.

Extensive measures have been taken to assure that a workable emergency plan can be implemented should it ever be needed.

As the recent heat wave has demonstrated, New England needs the electricity that Seabrook Station can produce. The only obstacle to providing this much needed electricity is to complete the lengthy licensing process which has been bogged down with political obstructions.

For these reasons, I encourage the timely completion of the licensing process for Seabrook and issuance of its 5% and full power licenses as soon as possible.

S Acerely,

.i ACW Donald E. Curry /

L i

l 8807050343 880622 PDR PR PDR 50 53FR16435 L)s-/ o

.