Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations
ML20196F758
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/22/1988
From: Richard Anderson
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR16435, RULE-PR-50 53FR16435-01355, 53FR16435-1355, NUDOCS 8807050315
Download: ML20196F758 (1)


Text

. __

LY $ &

SS E

N3FR[h3rj t m.r. n 4

'h 'M

'IB JR 23 P7 :57 June 22, 1988 0F5 !Cf..

.,.,,n, 00CKE ii.G s ' F,i.,lu Secretary of the Commision ATTN: Docketing and Service Branch U.S. Nuclear Regulatory Commision Washington D.C.

20555

Dear Sirs:

I am writing to urge your approval of the Clarification of Emergency Planning Reguirements For Low Power Testing, and specifically as it relates to Seabrook Station.

My wife and I live within the ten (10) mile radius of this facility and believe it to have been constructed and tested to the highest standards available today. We have observed, from time to time, the Evacuation Plan exercises conducted by the plant and other personnel. I believe that by the time the plant is ready for full power operation, the evacuation process will be second nature. However, this should under no circumstances stop low-power testing.

As an added note, I strongly oppose those narrow minded political individuals who,through their non-cooperation with evacuation planning, will eventually put a strangle hold on our nations growth and security.

Sincerely,

t. & L ichard F. Anderson 38 Crank Road Hampton Falls, NH 8807050315 880622 PDR.

P R hl6435 3