ML20196F549

From kanterella
Jump to navigation Jump to search

Forwards SE Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, for Plant,Unit 1
ML20196F549
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 12/02/1998
From: Harrison J
NRC (Affiliation Not Assigned)
To: Feigenbaum T, Harpster T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
Shared Package
ML20196F554 List:
References
GL-96-05, GL-96-5, TAC-M97099, NUDOCS 9812070067
Download: ML20196F549 (4)


Text

. -. . _ . . - _ _ ~ . _ _ . _ _ _ _ _ . . - - ..- - -. -.-._ . __. ._

hPe Y3 gu  !

g & UNITED STATES j

~

  • NUCLEAR REGULATORY COMMISSION WASHINGTON, D.c. 20046 4 001  !

\ . . . . . [t December 2, 1998 i

Mr. Ted C. Feigenbaum ,

l Executive Vice President and Chief Nuclear Omcor Nortn Atlantic Energy Service Corporation i clo Mr. Terry L Harpster '

P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SAFETY EVALUATION OF LICENSEE RESPONSE TO GENERIC LETTER l' . 96-05, " PERIODIC VERIFICATION OF DESIGN-BASIS CAPABILITY OF SAFETY-RELATED MOTOR-OPERATED VALVES," SEABROOK STATION,  ;

. UNIT 1 (TAC NO. M97099)

Dear Mr. Feigenbaum:

On September 18,1996, the NRC issued Generic Letter (GL) 96-05, " Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves," requesting each nuclear ,

power plant licensee to establish a program, or to ensure the effectiveness of its current  :

program, to periodically verify that safety-related motor-operated valves (MOVs) continue to be capable of performing their safety functions within the current licensing bases of the facility. o On November 15,1996, North Atlantic Energy Service Corporation (North Atlantic) submitted a 60-day response to GL 96-05 notifying the NRC that it would establish a program to meet the intent of the generic letter. On March 18,1997, North Atlantic submitted a 180-day response to GL 06-05 providing a summary description of the MOV periodic verification program planned to be implemented at the Seabrook Station (Seabrook). In a submittal dated April 6,1998, North Atlantic updated its commitment to GL 96-05.

The NRC staff has reviewed North Atlantic's submittals and applicable NRC inspection reports, and finds that North Atlantic has established an acceptable program to periodically verify the design-basis capability of the safety-related MOVs at Seabrook. As discussed in the enclosed safety evaluation, the staff concludes that North Atlantic is adequately addressing the actions requested in GL 96-05 at Seabrook.

inspections may be conducted by NRC staff to verify the implementation of the MOV periodic verification program at Seabrook subject to North Atlantic's commitments; the enclosed NRC safety evaluation; the NRC safety evaluation dated October 30,1997, on the Joint Owners Group Program on MOV Periodic Verification; and the NRC safety evaluation dated April 14,1998, on ,

the Westinghouse Owners Group methodology for ranking MOVs by their risk significance. t 9812070067 981202 M Gl d) g PDR ADOCK 05000443 P PM ,

ME E.E 8BIEB 68PY

l T. Feigenbaum If yo'J have any questions regarding the enclosed safety evaluation, please contact me at (301) 415-3199.

Sincerely,  ;

Original signed by John Harrison, Project Manager Project Directorate 1-3 Division of Reactor Projects - 1/11  ;

Office of Nuclear Reactor Regulation Docket No. 50-443 i

Enclosure:

Safety Evaluation 1

cc w/ encl: See next page l

l 1

l l

1 JISTRIBUTION

    • Opeltet FileW C. Cowgill J. Harrison D. Terao PUBLIC OGC T. Clark T. Scarbrough Seabrook r/f ACRS J. Zwolinski T. Harris (E-mail SE TLH3) l 1

. l l

DOCUMENT NAME: G:\ Harrison \M97099.gl  :

To receive a copy of this document, indicate in the box: "C" - Copy without i attachment / enclosure "E" - Copy with attachment / enclosure "N" = No copy 0FFICE PDI 3/PM l PDI 3/LA ,; n 10 EMCB SC _4 l6 Pg3fg6 ~ A) L i NAME JHerrison 5\B TCterk JAV Dierno m Ms' i DATE Q / "L. /98 ll /14 /98 l 2-/ 0 7_ /98 , '/_ / f /98 OFFICIAL RECORD COPY

-. _ .- .- -.. .-.. - -.=. . - . .

, . .-- .j

. I I

l I

~

T. Feigenbaum North Atlantic Energy Service Corporation Seabrook Station, Unit No.1 cc:

Lillian M. Cuoco, Esq. Mr. Peter LaPorte, Director Senior Nuclear Counsel ATTN: James Muckerheide i Northeast Utilities Service Company Massachusetts Emergency Management P.O. Box 270 Agency Hartford, CT 06141-0270: 400 Worcester Road P.O. Box 1496 Mr. Peter Brann Framingham, MA 01701-0317 Assistant Attomey General -

State House, Station #6 Jeffrey Howard, Attomey General Augusta, ME 04333 G. Dana Bisbee, Deputy Attomey General Ruident inspector _ 33 Capitol Street U.S. Nuclear Regulatory Commission Concord, NH 03301 Seabrook Nuclear Power Station P.O. Box 1149 Mr. Woodbury Fogg, Director Seabrook, NH 03874 New Hampshire Office of Emergency 1

Management Jane Spector State Office Park South Federal Energy Regulatory Commission 107 Pleasant Street 825 North Capital Street, N.E. Concord, NH 03301 Room 8105 Washington, DC 20426 Mr. Roy E. Hickok Nuclear Training Manager Town of Exeter Seabrook Station .

~

10 Front Street North Atlantic Energy Service Corp.

Exeter, NH 03823 P.O. Box 300 Seabrook, NH 03874 Regional Administrator, Region i U.S. Nuclear Regulatory Commission . Mr. Tony L. Harpster 475 Allendale Road Director of Licensing Services  !

King of Prussia, PA 19406 Seabrook Station I North Atlantic Energy Service Corp. l Office of the Attomey General P.O. Box 300 i One Ashburton Place Seabrook, NH 03874  !

20th Floor  !

Boston, MA 02108 Mr. D. M. Goebel l Vice President-Nuclear Oversight j

. Board of Selectmen Northeast Utilities Service Company Town of Amesbury P.O. Box 270 Yown Hall Hartford, CT 06141-0270 i Anesbury, MA 01913 - l Mr. W. A. DiProfio Mr. Dan McEihinney . Station Director Federal Emergency Management Agency Seabrook Station Region i North Atlantic Energy Service Corporation J.W. McCormack P.O. & P.O. Box 300 Courthouse Building, Room 401 Seabrook, NH 03874 i Boston, MA 02109

- e l

- l 1

I 1

i Mr. Frank W. Getman, Jr.  ;

20 Intemational Drive Suite 301 I Portsmouth, NH 03801 6809 Mr. B. D. Kenyon President - Nuclear Group 1 Northeast Utilities Service Group {

I P.O. Box 128 Waterford, CT 06385 Mr. David E. Carriere Director, Production Services Canal Electric Company 2421 Cranberry Highway Wareham, MA 02571 l

l l

l