ML20196F481

From kanterella
Jump to navigation Jump to search
Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations
ML20196F481
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/21/1988
From: Mahan W
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR16435, RULE-PR-50 53FR16435-01509, 53FR16435-1509, NUDOCS 8807050203
Download: ML20196F481 (1)


Text

I DOCXEf NUMBER nn PROPOSED RULE rn Q (53 FR 16 09 w u cic- / 09 Ut WJ

'88 M 23 P8 :45 cro n : -

00CKE i nth 7, y,c, ji.'t' BRANtu June 21, 1988 Secretary of the Commission Attn: Docketing and Service Branch U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Secretary:

I would like to request a 5% and 100% power license be issued to Seabrook Station on the basis that it was safely built, will be safely run and main-tained. We really do need more power in New England now and will continue to need more in the future for us and our children and their children.

Thank You fhf/h,.$f it

  1. ~ "

William F. Mahan 28 Virginia Lane Newburyport, MA 01950 l

4 wei-=

a

--