j NUCLEAR REGULATORY COMMISSION WA5HINGToN, D.C. 2066!H1001
\\...../
1 COMMONWEALTH EDISON COMPANY b.ND MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-254 QUAD CITIES NUCLEAR POWER STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.188 License No. DPR-29 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Commonwealth Edison Company (the licensee) dated March 30,1999, complies with the standards and l
requirements of the Atomic Energy Act of 1954, as amended (the Act) and the l
Commission's rules and regulations set forth in 10 CFR Chapter I;
)
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changing paragraphs 3.A, 3.B and 3.D and deleting paragraphs 3.M and 3.N of Facility Operating License No. DPR-29* and is hereby amended to read as follows:
l l
- License pages 4,5, and 6 are attached, for convenience, for the composite license to reflect this change.
I 9906290200 990625 PDR ADOCK 05000254 P
PDR E
g
. A.
Maximum Power Level Commonwealth Edison is authorized to operate Quad-Cities Unit No.1 at power levels not in excess of 2511 megawatts (thermal).
B.
Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.188, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
D.
Eaualizer Valve Restriction Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.
M.
Deleted N.
Deleted 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days.
FOR THE NUC EAR REGULATORY COMMISSION fn hony J. Mendiola, Chief, Section 2 roject Directorate ill ivision of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
License pages 4,5, and 6 Date ofissuance:
June 25, 1999
7
. 3.
This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50 and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
A.
Maximum Power Level Commonwealth Edison is authorized to operate Quad-Cities Unit No.1 at power l
levels not in excess of 2511 megawatts (thermal).
B.
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.188 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
C.
The licensee shall maintain the commitments made in response to the March 14, 1983, NUREG-0737 Order, subject to the following provision:
The licensee may make changes to commitments made in response to the March 14,1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRC approval, pursuant to the requirements of 10 CFR 50.59. Consistent with this regulation, if the change results in an Unreviewed Safety Question, a license amendment shall be submitted to the NRC staff for review and approval prior to implementation of the change.
D.
Eaualizer Valve Restriction Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.
E..
The licensee shall fully implement and maintain in effect all provisions of the Commission approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions of 10 CFR 73.55 (51 FR 27817 and 27822), and to the authority of 10 CFR 50.90 and 10 CFR 50.54 (p). These plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: " Quad-Cities Nuclear Power Station Security Fian, with revisions submitted through September 17,1992; ' Quad-Cities Nuclear Amendment No.188
4
, Power Station Security Perscrinel Training and Qualification Plan," with revisions submitted through July 15,1992; and " Quad-Cities Nuclear Power Station Safeguards Contingency Plan," with revisions submitted through July 15,1992.
Changes made in accordance with 10 CFR 73.55, shall be implemented in accordance with the schedule set forth therein.
F.
Commonwealth Edison Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Reports dated July 27,1979 with supplements dated November 5,1980 and February 12,1981; December 30,1982; December 1,1987 with supplement dated April 20,1988; December 11,1987 with supplement dated July 21,1988; and February 25,1991, subject to the following provision:
The licensee may make changes to the approved fire protection program j
without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G.
Deleted H.
Deleted by incorporation into 3.E above, per Amendment No. 64 dated March 19, 1981.
l.
(OPEN).
J.
Deleted.
K.
Deleted by Amendment No.103 dated December 15,1987.
L.
Deleted.
M.
Deleted.
N.
Deleted Amendment No.188
4
, 4.
This license is effective as of the date of issuance, and shall expire at midnight, December 14,2012.
l FOR THE ATOMIC ENERGY COMMISSION Original signed by:
A. Giambusso, Deputy Director for Reactor Projects Division of Licensing
Enclosures:
Appendixes A and B --
Technical Specifications Amendment No.188
put1u g*
4&
UNITED STATES j
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 2006dL4001
- ,[
49 COMMONWEALTH EDISON COMPANY 6N_g MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-265 QUAD CITIES NUCLEAR POWER STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.185 License No. DPR-30 t
1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Commonwealth Edison Company (the licensee) dated March 30,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changing paragraphs 3.B and 3.D and deleting paragraphs 3.L. and 3.M. of Facility Operating License No. DPR-30* and is hereby amended to read as follows:
- License pages 4, 5, and 6 are attached, for convenience, for the composite license to reflect this change.
I
. B.
Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.185, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
D.
Ecualizer Valve Restriction Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.
L.
Deleted M.
Deleted 3.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days.
FOR THE NUCLEAf$ REGUI.ATORY COMMISSION
,./ /
/'
,A w
c
,/
nthony J. Mendiola, Chief, Section 2
/
Ject Directorate lli
[
Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
License pages 4,5, and 6 Date of Issuance: June 25, 1999 i
l 1
e
. 3.
This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50 and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
A.
Maximum Power Level Commonwealth Edison is authorized to operate Quad-Cities Unit No. 2 at power levels not in excess of 2511 megawatts (thermal).
B.
Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.185 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
C.
The licensee shall maintain the commitments made in response to the March 14, 1983, NUREG-0737 Order, subject to the following provision:
The licensee may make changes to commitments made in response to the March 14,1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRC approval, pursuant to the requirements of 10 CFR 50.59. Consistent with this regulation, if the change results in an Unreviewed Safety Question, a license amendment shall be submitted to the NRC staff for review and approval prior to implementation of the change.
D.
Eaualizer Valve Restriction Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.
E.
The licensee shall fully implement and maintain in effect all provisions of the Commission approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions of 10 CFR 73.55 (51 FR 27817 and 27822), and to the authority of 10 CFR 50.90 and 10 CFR 50.54 (p). These plans, which contain Safeguards information protected under 10 CFR 73.21, are entitled: " Quad-Cities Nuclear Power Station Security Plan," with revisions submitted through September 17,1992; " Quad-Cities Nuclear Amendment No. 185 j
. Power Station Security Personnel Training and Qualification Plan," with revisions submitted through July 15,1992; and " Quad-Cities Nuclear Power Station Safeguards Contingency Plan," with revisions submitted through July 15,1992.
Changes made in accordance with 10 CFR 73.55, shall be implemented in accordance with the schedule set forth therein.
F.
Commonwealth Edison Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as apprged in the Safety Evaluation Reports dated July 27,1979 with supplements dated November 5,1980 and February 12,1981; December 30,1982; December 1,1987 with supplement dated April 20,1988; December 11,1987 with supplement dated July 21,1988; and February 25,1991, subject to the following provision:
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G.
Deleted by incorporation into 3.E above, per Amendment No. 58 dated March 19, 1981.
H.
- Deleted, l.
Deleted.
J.
Deleted.
K.
Deleted.
L.
Deleted.
M.
Deleted i
l Amendment No.185
. 4.
This license is effective as of the date of issuance, t..id shall expire at midnight, December 14,2012.
FOR THE ATOMIC ENERGY COMMISSION
)
Original signed by:
A. Giambusso, Deputy Director for Reactor Projects Division of Licensing
Enclosures:
Appendixes A and B -
Technical Specifications Date of issuance: December 14,1972 4