ML20196F295
| ML20196F295 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/23/1988 |
| From: | Gasnepain S AFFILIATION NOT ASSIGNED |
| To: | NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| FRN-53FR16435, RULE-PR-50 53FR16435-01405, 53FR16435-1405, NUDOCS 8807050132 | |
| Download: ML20196F295 (1) | |
Text
[/ '
a 05 00?f1 NUMBCR j
298A Salmon Falls Road W6MF0 Ruli R
NH 03867 Cf3 FR /W3D "ochester, 9M o3) 335-458 Secretarv of the Commision Attn: Docketing and Service Branch 00 EM 23 P8 :15 U.S Nuclear Regulatorv Commission Washington, D.C.
20555 OFF !'"INNh 4 00Cd Th!R Dear Secretarv of the Commission' As we approach the end of wet another wear in the licensiNuME" fiasco of Seabrook Station one must wonder Just what is going on.
We have a technologw that has existed for decades. It has been used safelv and has Proven to be the most reliable, cleant usable enerdw source aveilable to mankind with Present technologue The reason for this letter is that I support Nuclear Power and the licensing of the Seabrook facilitw. It is mv opinion that the NRC has spent far to much time slreadw catering to the blatent attempts of Political demagos's to rise above the accepted norm's of society.
Moralls, Dukakis is wrong in what he has done to hinder the licensing of the station. It was intended that govenors suPPors she formation of Plans to the best of his states ability. It was uP to the NRC and FEMA to determine the adecuacw of the Plans. The ' DUKE' has short circuited those Plans and the NRC has allowed it.
We need to know that someone in Washington has enough intestine 1 fertitude to finalls saw this is enough. We've Plaved the game for verrs, and we are not going to Plaw anw more. The NRC needs to fir the wrong that was put into effect wears ago during the phase of over-reaction folicwind the TMI incident. The NRC does not need to cover itself. In the short term the NRC needs to do things:
1.
Get back to the business at hand, Regulate the industrv, keep some resemblence of common sense.
2.
Issue a full Power license to Seabrook with tweical low Power testing restrictions. There should be no more litigation, no more ouestions. If people or organizations had ouestions then certain19 bw now thew've hed the oPPortunitw to Bsk.
In the long run I stonglw urge the NRC to censider the following:
1.
Through the s t ard a rd i z a ti on of Nuclear Plant design cost can be cut across the board. A mvriad of advantages would be reali:ed as is evident through close examination of the French program.
2.
Educate the Public !!!!!!!3 If We had an informed Public in this countrv the abilitw of a man like Dukakis to ride an issue to the highest office of the land in such a deceitful manner would be impossible.
In addition, the billions of dollars that has been wasted Just in litigation woul,d have ultimatelv staved in the consumers Pocket.
I would like to saw in closing, SEABROOK POWER IS NEEDED, and without a doubt it shall operate. Do it now, issue a full Power operating license with restrictions for the completion of five Percent testing. It is the onlw logical thing to do.
Si
- relv, 8807050132 880623
~
PDR PR 4
V 50 53FR16435 PDR St Phes)J. GegnePain N