ML20196F097

From kanterella
Jump to navigation Jump to search
Forwards Corrected Page B 3/4 1-3 to Proposed Tech Specs,Dtd 880212.Error Located in Third Paragraph of Section 3/4.1.3, Movable Control Assemblies
ML20196F097
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 02/25/1988
From: Mihalak J
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20196F103 List:
References
FCM-88-034, FCM-88-34, NUDOCS 8803020033
Download: ML20196F097 (2)


Text

_ _ _ _ _ _ _ _ _ - _ _ _ _

a r.

c1 BALTIMORE OAS AND ELECTRIC i

CHARLES CENTER. P.O. BOX 1475. BALTIMORE. MARYLAND 21203 i

NUCLEAR ENGINEERING SERVICES DEPARTMENT CALytmf CUFFS NVCLEAR POWER PLANT k

LUS57. WAAYtANO 20687 February 25, 1988 FCM 88 034 U. S. Nuclear Regulatory Commission Washington, D.

C.

20555 ATTENTION:

Document Coatrol Delk

SUBJECT:

Calvert Cliifs Nuclear Power Plant t

Unit No. 1; Locket No. 50-317 Error on Page B 3/413 of Section 9 of Reference (ai

REFERENCE:

(A) Letter from Mr. J. A. Tiernan (BG&E), to Document Control i

Desk (NRC), "Unit 1 Cycle 10 Reload License Request for Amendment',' dated February 12, 1988 i

Reference (a) as submitted on February 12, 1988, contains an error on page B 3/4 13 in Section 9 of the Attachment (design report). The error was overlooked on the final submittal delivsred to the Document Control Desk and not identified until February 16, 1988. Fr.

S.

A. McNeil (NRC) was informed of the error immediately upon its discovery, i

t The error is located in the third paragraph of Section 3/4.1.3 MOVABLE CONTROL ASSEMBLIES of the proposd Technical Specification replacement page. The sentence structure in the paragraph was scrambled such that it did not make sense. A replacement page is enclosed with this letter correcting the error.

~

P[icipa1 Engineer Fhe Cycle Management JAM /DSE/imt Enclosure cc:

S. A. McNeil (NRC)

M. E. Bowman /L. E. Saiyards (BC&E)

D. S. Elkins (BG&E)

File: FCR 88 3000 pl 7

m3988?A8188lk P

enr64o87I