ML20196F097
| ML20196F097 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 02/25/1988 |
| From: | Mihalak J BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20196F103 | List: |
| References | |
| FCM-88-034, FCM-88-34, NUDOCS 8803020033 | |
| Download: ML20196F097 (2) | |
Text
_ _ _ _ _ _ _ _ _ - _ _ _ _
a r.
c1 BALTIMORE OAS AND ELECTRIC i
CHARLES CENTER. P.O. BOX 1475. BALTIMORE. MARYLAND 21203 i
NUCLEAR ENGINEERING SERVICES DEPARTMENT CALytmf CUFFS NVCLEAR POWER PLANT k
LUS57. WAAYtANO 20687 February 25, 1988 FCM 88 034 U. S. Nuclear Regulatory Commission Washington, D.
C.
20555 ATTENTION:
Document Coatrol Delk
SUBJECT:
Calvert Cliifs Nuclear Power Plant t
Unit No. 1; Locket No. 50-317 Error on Page B 3/413 of Section 9 of Reference (ai
REFERENCE:
(A) Letter from Mr. J. A. Tiernan (BG&E), to Document Control i
Desk (NRC), "Unit 1 Cycle 10 Reload License Request for Amendment',' dated February 12, 1988 i
Reference (a) as submitted on February 12, 1988, contains an error on page B 3/4 13 in Section 9 of the Attachment (design report). The error was overlooked on the final submittal delivsred to the Document Control Desk and not identified until February 16, 1988. Fr.
S.
A. McNeil (NRC) was informed of the error immediately upon its discovery, i
t The error is located in the third paragraph of Section 3/4.1.3 MOVABLE CONTROL ASSEMBLIES of the proposd Technical Specification replacement page. The sentence structure in the paragraph was scrambled such that it did not make sense. A replacement page is enclosed with this letter correcting the error.
~
P[icipa1 Engineer Fhe Cycle Management JAM /DSE/imt Enclosure cc:
S. A. McNeil (NRC)
M. E. Bowman /L. E. Saiyards (BC&E)
D. S. Elkins (BG&E)
File: FCR 88 3000 pl 7
m3988?A8188lk P
enr64o87I