o C
The Attachment Contains Proprietary information Thomas A. Green, Project Manager GE Nuclear Energy 175 Curtner Avenue San Jose, CA 95125
SUBJECT:
ISSUANCE OF DRAFT SAFETY EVALUATION OF T PICAL REPORT NEDC-32721P," APPLICATION METHODOLOGY FOR THE GENERAL ELECTRIC STACKED DISK ECCS SUCTION STRAINER" Dear Mr. Green
/
I
/
By letters dated April 3,1997, and November 21,1997,faeneral Electric Company (GE) submitted Topical Report NEDC-32721P, "ApplicatioryMethadology for the General Electric Stacked Disk ECCS Suction Strainer," to the Nucleaf Regu Gory Commission for review. On February 3,1999, the staff issued Part i of its safefy evaluation which provided the staff's evaluation of the methodology used to determine strainer performance. Part 11 of the staff's review addressed the methodology to determ <fe the structural loadings due to hydrodynamic forces during an accident. The staff has com)pleted its evaluation of the structuralloa has prepared a draft safety evaluation which is attached.
The evaluation is still in draft form a as received limited management review. However, at this stage of review, the staff has concluded that a technical meeting would be beneficial between GE, licensees who havy' installed the GE strainer, and the staff. To this end, the staff will use the draft SER as the bgsis of presenting the current thinking of the staff. It is hoped that by using the information in such a manner it will hasten the path to resolution.
)
l Because the attached S fety Evaluation Report (SER), based on your proprietary Licensing Topical Report NEDC-721P, submitted November 21,1997, contains proprietary information, it is being protected der the provisions of 10 CFR 2.790(d) and is being withheld from public disclosure.
Sincerely,
/
g- (0 Michael J. Davis, Project Manager Generic issues, Environmental, Financial & Rulemaking V
Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation N"v4
Enclosure:
As stated m
DISTRIBUTION:pentral Files (w/ enclosure)
RD g-r6E PDR (w/o enclosure)
DOCUMENT NAME: PROPRIET.WPD
- See previous concurrence d
8 l
OFFICE SPSB:DSSA
- RGEB: DRIP
- SC:SPLB
- BS:SPLB
- OGC/7/j[
t v
NAME JKudrick:bw MDavis GHubbard JHannon MSiemien DATE 6/8/99 6/8/99 6/8/99 6/8/99 6/M9 OFFICIAL RECORD COPY cLg LnR ENct ID A I
9906290116 99g h PDR TOPRP EM L J 7 C.o
/
D PDR C
e eB0ftg a
t UNITED STATES g
g NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666 4001 The Attachment ConfaN hdpfibry Information Thomas A. Green, Project Manager GE Nuclear Energy 175 Curtner Avenue San Jose, CA 95125
SUBJECT:
ISSUANCE OF DRAFT SAFETY EVALUATION OF TOPICAL REPORT NEDC-32721P, " APPLICATION METHODOLOGY FOR THE GENERAL ELECTRIC STACKED DISK ECCS SUCTION STRAINER" l
Dear Mr. Green By letters dated April 3,1997, and November 21,1997, General Electric Company (GE) submitted Topical Report NEDC-32721P, " Application Methodology for the General Electric Stacked Disk ECCS Suction Strainer," to the Nuclear Regulatory Commission for review. On February 3,1999, the staff issued Part I of its safety evaluation which provided the staff's evaluation of the methodology used to determine strainer performance. Part 11 of the staff's review addressed the methodology to determine the structural loadings due to hydrodynamic forces during an accident. The staff has completed its evaluation of the structuralloadings and has prepared a draft safety evaluation which is attached.
The evaluation is still in draft form and has received limited management review. However, at this stage of review, the staff has concluded that a technical meeting would be beneficial between GE, licensees who have installed the GE strainer, and the staff. It is hoped that by using the information in such a manner it will hasten the path to resolution.
Because the attached Safety Evaluation Report (SER), based on your proprietary Licensing Topical Report NEDC-32721 P, submitted November 21,1997, contains proprietary information, it is being protected under the provisions of 10 CFR 2.790(d) and is being withheld from public disclosure. We are providing you this draft SER for the sole purpose of identifying proprietary information contained therein Please respond by July 30,1999, supplying a bracketed version of this SER and an affadavit providing the reasons that you consider this information to be proprietery.
Sincerely,
%k
/
Michael J. Davis, Project Manager Generic issues, Environmental, Financial & Rulemaking Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulatien
Enclosure:
As stated
=
GE Nuclear Energy.
cc(w/o enclosure):
1 l
Joseph F. Quirk, Manager l
. industry Programs i
GE Nuclear Energy i
175 Curtner Avenue l
San Jose, CA 95125 George B. Stramback Regulatory Services Project Manager GE Nuclear Energy 175 Curtner Avenue San Jose, CA 95125 l
l James F. Klapproth, Manager Engineering & Technology l.
GE Nuclear Energy l
175 Curtner Avenue l
San Jose, CA 95125 Charles M. Vaughan, Manager Facility Licensing GE Nuclear Energy P.O. Box 780 l
Wilmington, NC 28402 l
Glenn A. Watford, Manager l
Nuclear Fuel Engineering i
GE Nuclear Energy j
l P.O.. Box 780 Wilmington, NC 28402 l