November 25, 1998 Mr. Oliver D. Kingsley President, Nuclear Generation Group Commonwealth Edison Company -
ATTN: Regulatory Services Executive Towers West 111 1400 Opus Place, Suite 500 Downers Grove, IL 60515 i
Dear.Mr. Kingsley:
SUBJECT:
NRC OVERSIGHT PANEL MEETING
SUMMARY
Dear Mr. Kingsley:
l The NRC staff met with Commonwealth Edison and LaSalle County Station management on October 27,1998. This management meeting was open to public observation. The purpose of
' the meeting was to discuss experiences and performance of LaSalle since restart of Unit 1, the status of the material condition of LaSalle, and to discuss the progress made in planning the Unit 2 outage. Enclosure 1 contains the associated meeting summary. Enclosure 2 contains the handout provided to the NRC Oversight Panel by Commonwealth Edison during the
- meeting.'
in accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in NRC's Public l
Document Room.
i l
Sincerely,
)
. Original signed by Geoffrey E. Grant, Director Division of Reactor Projects Docket Nos:. 50-373; 50-374 i
)
Enclosures:
1.
Meeting Summary 2.
Licensee Meeting Handout 3^(
l:
See Attached Distribution l;
DOCUMENT NAME: G:\\lasa\\las10278. sum To seceive a espy of this docunient,indloate in the box "C" = Copy whhout ettschment/ enclosure *E' = Copy with attachment /encioeure w' = w.
i-OFFICE Rlli
-l6 Rlli lA)
Rlli l
l NAME Hills:co o@
LanksburyGdS Grant dh
'/
e DATE 11/F 98 11/.25/98 11/75/98 1 1
/
OFFICIAL RECORD COPY b
~
9812040190'981125 PDR ' ADOCK 05000373 P
O. Kingsley cc w/encis:
D. Helwig, Senior Vice President H. Stanley, PWR Vice President C. Crane, BWR Vice President R. Krich, Regulatory Services Manager D. Greene, Licensing Director DCD-Licensing F. Dacimo, Site Vice President T. O'Connor, Station Manager P. Barnes, Regulatory Assurance Supervisor R. Hubbard M. Aguilar, Assistant Attorney General State Liaison Officer Chairman, Illinois Commerce Commission Distribution:
SAR (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/encls J. Caldwell, Rlll w/encls C. Pederson, Rlli w/encls B. Clayton, Rill w/encls SRI LaSalle w/encls DRP w/encls TSS w/encls DRS (2) w/encis Rlli PRR /encls
. PUBLI-fw/encls Docket File w/encls GREENS IEO (E-Mail)
DOCDESK (E-Mail)
I i
l 040007
4 s
\\
Public Meeting Summary LaSalle County Station l
October 27.1998. Manaaement Meetin_g Summary:
The licensee provided the NRC representatives with a handout (Enclosure 2) and discussed the information contained in the handout during the meeting. The discussion centered around the performance of Unit 1 since startup, the material condition of LaSalle, and the status of the outage activities on Unit 2. Specifically, the areas discussed relating to Unit 1 performance included the plant operating history, human performance, the material condition and processes related to improving material condition, and the plans for an upcoming Unit 1 outage. Topics discussed related to Unit 2 included an overview of the outage scope and schedule. The licensee also discussed plans for long-term station improvements.
The licensee specifically provided the following information:
The licensee discussed the Unit 1 operating history since startup, including information related to the reactor core isolation cooling system rupture disc event which occurred on September 17,1998. The licensee used corporate and vendor resources to improve the rupture disc event investigation. The licensee concluded that the improvements in the corrective action process and procedures which were implemented during the extended Unit 1 shutdown resulted in an improved event investigation.
Human performance continued to improve at the station and operations personnel errors decreased. In addition, the licensee indicated that the operations personnel error rate, although still greater than industry standards, was decreasing. Other department event free clocks indicated improved performance and operations performance showed the most improvement and lowest error rates.
The licensee indicated that material condition improved at LaSalle Station as a result of the work done during the forced outage. However, material condition improvements 5
were still necessary. The licensee also believed that the processes used to control and p!an work at the station still needed improvement. The licensee indicated that the 12-week work schedule was a key to the station's ability to get more work done and more resources would be used to plan work in a more timely manner (Live Time Planning).
Several areas showed improvement including the percent of contaminated floor space, the number of operator work-arounds, and the number of control room distractions.
The licensee provided an overview of the Unit 1 planned outage which was scheduled for December 5,1998, and would last less than 7 days. Approximately 330 work request tasks were planned and the majority of the tasks were related to Technical Specification surveillances.
I The Unit 2 outage scope was based on the same screening criteria that were used to define the scope of the Unit 1 forced outage. The licensee indicated that the lessons leamed from the Unit 1 forced outage were incorporated into the planning for the Unit 2 outage. All design changes completed on Unit 1 were reviewed and incorporated into the Unit 2 outage scope by the licensee. In addition, the licensee reviewed the operations issues that were encountered during the startup of Unit 1 and incorporated the lessons learned into the plans for Unit 2. The Unit 2 outage scope included 373 design changes, approximately 4,174 preventive maintenance / surveillance tasks, and 1,427 corrective maintenance tasks.
The licensee projected that Unit 2 would be at 100 percent power by June 1,1999.
Long-term improvements at LaSalle would be based on the Station Business Plan with the goal being top-quartile performance by 2001. The licensee's Station Business Plan also addressed performance improvements for all departments at LaSalle.
The licensee discussed the need to improve the capability to resolve technical issues, citing examples where troubleshooting activities did not meet management expectations. Improvements would be realized by increased use of external support, such as corporate and vendor experience, and increased basic technical knowledge of the engineering staff.
During the discussion, the NRC staff communicated the following questions or items for consideration:
The NRC staff questioned the licensee about the extent of the material condition improvements. The NRC staff requested that in future meetings the licensee discuss the corrective actions to improve the work process, the actual progress seen on material condition improvements, and the licensee's current characterization of material condition at LaSalle Station.
The NRC staff inquired regarding the number of design changes that were being completed to bring the plant back into compliance with the design and licensing basis.
The licensee indicated that approximately 30 to 35 percent of the modifications being completed on Unit 2 were necessary to bring the plant into compliance.
The NRC staff inquired regarding the licensee's detailed schedule for the Unit 2 outage.
The licensee indicated that the schedule would be provided after it is generated. Any meetings to discuss the outage schedule and scope would be arranged as necessary.
The NRC staff was interested in the long-term improvements in the licensee's engineering organization given the problems that the licensee was having with the engineering capability prior to the dual unit shutdown and the current issues related to the resolution of technicalissues. The NRC requested that the licensee address the long-term improvement plans for engineering at LaSalle during the next public meeting.
i 2
t
1 a
\\
1
~
i The NRC cautioned the licensee about the potential impact of the Unit 2 restart activities, particularly the planned integrated testing, on the operators' ability to operate Unit 1. The licensee indicated that the plans related to control room operations would be addressed at the next public meeting.
\\.
s I
I b
l I
I..
3 l
7 i
i Meeting Attendees Nuclear Reaulatory Commission i
J. Caldwell, Acting Regional Administrator, Region ill
_ G. Grant, Director, Division of Reactor Projects, Region Ill S. Reynolds, Deputy Director, Division of Reactor Safety, Region 111 R. Lanksbury, Acting Chief, Branch 2, Division of Reactor Projects, Region 111 i
M. Huber, Senior Resident inspector, LaSalle, Division of Reactor Projects, Region ill Cornmonwealth Edison O. Kingsley, President, Nuclear Generating Group D. Helwig, Senior Vice-President C. Crane, Vice-President of Boiling Water Reactor Operations J. Benjamin, Vice-President, Nuclear Oversight R. Krich, Vice-President, Regulatory Services F. Dacimo, Site Vice-President, LaSalle -
T. O'Connor, Station Manager, LaSalle
+
D. Farr, Operations Manager, LaSalle Unit 1 :
J. Arnould, Operations Manager, LaSalle Unit 2 G. Heisterman, Maintenance Manager, LaSalle Unit 1 G. Campbell, Engineering Manager, LaSalle Unit 1 -
T. Dobbs, Unit 2 Restart Manager
. W. Riffer, Nuclear Oversight Manager, LaSalle P. Bames, Restart Manager, LaSalle Other attendees from Commonwealth Edison were also present.
i f
(
i e
4 s
i i
i t
i i
r Licensee Meeting Handout i
l I
i l
I r.
I l
(~
L A
1 I
EEEE t
LaSalle County NRC Public Meeting I
October 27,1998 1
i t
i i
I f
l
\\
LaSalle 1
.i EEElf Agenda l'
Introduction F. Dacimo Unit 1 Performance D. Farr Material Condition G. Heisterman Overview of L1P02 G. Campbell j
Unit 2 Outage Scope T. O'Connor Unit 2 Schedule T. Dobbs Long Term Improvements D. Farr Summary F. Dacimo LaSalle 2
4 I
1%
6JYb0 L'
e e
m
(
]
3 oE' eo@i8 i
eS&#OU s.
Eo9 e a
o0kE!m
~
wNo
=
M8
/
a1 n9 u/ 9 a
8 l
voo
+I
- Nl a
h' >
s
- i' I
I C
'2 I
R
'2 A
M
'2 4
a oo R9 E9
/
C1 x3
/
I 7 0
R1 i
t F8 C/
o0 9
/
/
R9 d 5
/
a C2 R8 C8 oo D
I 6
2 C
w8
\\
I S
/
p A9 t
8 d
u j
r L
an u
e C
s s
t i
O D
a1 1
l vo w
L
/
ale 2 k
c 7
E e/
t a
v s 9 e
e8 n
t t
No o
BPO o
g\\
- 0 s
N d
- /
y r
\\
N l,bg g\\
p 3o D
D QN@mDW co ll1 lIl llI l
lj\\
l, IJ 1,
1Il
I Egggf Station Human Pedormance t
Station Event Free Clock 16 -
14 -
y 12 -
ea c 10 -~~"~
e e
2 8-e m
>=
6-g a
Currently 34 Days Event Free E
4-2-
0 c._r,_.,_,.
,.__.r___,
b tw tw 5
tw oo co oo 00 oo e
e e
e e
e e
e e
e e
e g
a o.
c x
3 c.
i o
4 4
m m
4 5
m 2
z e
2 i
f LaSalle 4
A USS5$
peradons Human Performance O
Operations Event Free Clock Operations Error Rate 8
8 h
?'
'\\Al k
I7 a' xI i R SV i
li I
s.
f-F
- s. ' II L
'T I
i II si Irs a_
lI 3' II Im II I I It's l
I II II II II I. II I
- II II "II II II I'I I
%c.,;s.,;,;v,,.,;s.,;,;v,,c.,,
s,, %,, +.,, %,, %,,,,, s,,
Goal = 1.0 l
LaSalle 5
6 EEEIl Material Condition System Health Indicator Program (SHIP)
- Corrective Maintenance Backlog
- Maintenance Rule
- Modifications
- Engineering Requests
- Work-arounds
- Temporary Alterations l
- Deratings l
l LaSalle 6
EEEli Matenal Condition
\\
'J l
SHIP -CONTIBUTORS TO RED AND YELLOW SYSTEM S l
30 -
27 I
k 3
25
\\
23
\\
e 21
\\
E
\\
\\
3 20 j
i
\\
g t
15 i
g 15 -
\\
e
\\
j 1
$ 10 -
\\
\\
i
\\
3 2
5
. un t
i O
.. - s - --
4 Total CM Maint Rule a(1)
CM > 2 Years M O D's > 3 E R's > 2 Years Work Arounds TALTS Design OP B ac klog Corr Act Phase Old Years Old Old Assessments LaSalle l
7 i
I i
L
b Eggg Material Condition Material Condition improvement tied to 12 Week Work Schedule Package planning output problems
. Ineffective planning
. Work Bundling
- Increased Engineering involvement Initiatives
- Instituting Live Time Planning
- Work Request Backlog Reduction LaSalle e
i
l>
t';
![l
- r r
l?[
[
{'
lh f
,h fi'
- [
I t
,[h
!t i>
e
%V m3'l D-o
'a.
A M=
~
]~
~ %
m
~
~
~
=
US 08
$S
%8
$S 8
o
$8 w $S c, y
(, '
I ;
2 I$
l
- [,
, j '
- 8 l
e 4 08 08 c
o $$
$8 m
8
~
m0 r
l 8
a$
m a
aO a
w u
uS M
o 7
8 8
8 8
8 8
8 8
8 8
8 8
8 8
8 8
8 8
8 8
8 8
8 8 - 8 8
9 9
9 9
9 9
9 9
9 9
9 9
9 9
9 9
9 9
9 9
9 9
9 9
9 9
9 y
y y
n n
l lu g
g p
p t
t c
n n
b b
r r
r r
v v
v c
c u
e a
a e
e a
a p
p a
a u
u J
J u
u e
e c
c a
o o
o e
e A
A S
S O
O D
J J
F F
M M
A A
M M
M J
J N
N N
D D
2 8
1 5
8 2
8 2
5 9
4 8
3 7
1 1
2 9
3 8
0 4
8 5
9 3
7 8
1 1
2 1
1 2
2 2
1 1
3 2
2 1
2 1
2 2
- l1 o3 0y>
O r
I gm e
I l
lI!Ill 1
l l
WEEE 1999 Non Outage Backlog Workdown UnN 1N t
1000 l
900 800 700 600 500 400 300 t
200 100 j
0 i
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec i
Jan Fe b Mar Apr Mt; l Jun Jul Aug Sep O ct Nov Dec t
M Actual Goal 900 800 700 600 500 400 350 300 250 200 175 150 l
LaSalle l
10 i
I
Number of WRs o
m 2
1/5/98 i.
I g
1/19/98 g
m
~
2/2/98 }_
l 2/16/98 ~
~
~
h 3/2/98 [
j 3/16/98 ~
f N
I I
- t 3/30/98 ~~
l 4/13/98 2 O
~
- t j
4/27/98 n
l l
5/11/98 n
~~
+
n 5/25/98 ~~
i n
~
~
n 6/8/98 [_
- t O
x
~~
6/22/98 i-
- t l
O 7/6/98 ~~
V
(
3.
T x
gI 7/20/98 n
Ei !
~
t x
E 8/3/98 i
h#
8/17/98 --
k i
x i
I i
8/31/98
~
i t
n l
l 9/14/98 h
x n
i 9/28/98
~
0*
x x
10/12/98
~
af j; Mt i
l l
G W
8 8
e a
8 d
Number of WRs l
~.... - -, - - - - - -,..
...,, - -.. _ - -. -. - ~,.
b j;i j
[l![!
- t'
!!f
,i W
Qm h ""
7 7
p, y m
-Q%F.v QO
~
c I
,l:
I c
I i i -
3 i
1 r
y s
s A
I i
l i
I A
W l
,i W
O O
f fo o
r r
e e
b b
t t
t t
s s l
s nr xxx
$m m$
t t
x x H H
- c. xt : xJ x
- xxxxt
' ut Hxxx"xxl s s u
J J
J t
i i i uiil i
i u
N i i iii N
w w
w r
-y a
w m
r e
e
,a
~-[
- ~ _ - _
[
~
[
}
~ - - _
- ~ ~ -
[
_ ~ _
o
[
~ _ ~
~ _
~
~ ~
- ~ ~ ~
r, 7
7 7
7 8
8 8
8 8
8 8
8 8
8 8
8 8
8 8
8 8
8 8
8 8
9 9
9 9
9 9
9 9
9 9
9 9
9 9
9 9
9 9
9 9
9 9
9 9
9
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
0 4
8 2
5 9
2 6
2 8
0 3
7 1
5 8
2 6
0 3
7 1
4 8
2 1
2
/
2 1
1 1
3 1
2 1
2
/
2
/
/
/
/
/
2 1
3 1
2 1
/
/
2
/
1
/
2
/
3
/
/
/
/
/
/
6
/
7
/
8
/
/
/
/
/
1 1
1 2
1 2
3 3
4 4
5 5
6 7
8 8
9 9
0 1
1 1
1
@. E$f 5-1i o 8-l w
c D2 Dg@
aN
.r
,s v
w
i F
i i
v i
i
% Contaminated Floor Space 4
4 N
M o
(J1 O
Ut O
U1 t
I i
i i
i i
m g
Jan-97 j
Jan-98 t
Feb O
Mar O
D i
Apr o
CD
]
May Jun D
o 5
D Jul i
O Aug Q
{
Sep I
T O
Oct o
l N
Nov i
D@
Dec l
D l
g c)
H O
su o
m r+
C C
i m
fu l
r+
3 1
,I l
I' WBRfl OVe/ View of L?PG2 Purpose
)
- Perform Tech Spec surveillances, preventive maintenance and other commitments to support an j
L1R08 outage date of 1/8/00
- Perform corrective maintenance to enable a continuous unit run to L1R08 f
Schedule
- Start 12/5/98
- Target duration is <7 days (breaker to breaker) l I
LaSalle 14
Egggi Over/iew of L1PG2
]
Scope
- 331 Work Request Tasks 113 Surveillances 27 Snubber Inspections 23 Local Leak Rate Tests 1
19 Preventive Maintenance Tasks 7 Design Change Pac < ages i
i LaSalle 15
4 O
WNNEI L1P02 6 Days 13 hrs Y
Y 100 %
Generator Cold Generator 100 %
Power Off S/D SDC Startup On-Line Power Div 2 Swap Div 1 0
0 0
0 0
0 C.
i 18 19 11 8
55 3
73
^
Hours A Hours Hours Hours Hours Hours Hours Relay Logic Test Relay Logic Test MOV Stem Lubes MOV Stem Lubes LOS-RH-Q1&Q3 LOS-RH-QI LOS-LP-Q1&Q3 LOS-RH-Q3 D/G 24 hr run D/G 24 hr run Battery Disch Test 2 LLRT's Battery inspection Charger Inspection Charger Capacity Div 3 131 Hours Div 3 RTT Relay Logic Test LOS-HP-Ql&Q3 Battery Disch Test Charger Capacity 1LLRT D/G 24 Hr Run t
D/G Stan/ Load Test 3
D/G Tripffrip Bypass Low Press EFCV LaSalle 16 i
m
e EEEll Overview of L1PG2 i
?
Planning
- Activities walked down by performer
- Rigor for completing pre-outage activities
- Project Managers for special scopes of work
- LaSalle Team on shift t
i i
[
I i
I LaSalle i
17 i
f
H EEEli Over/iew of L1PO2 i
Significant work to be performed j
l
- Replace A and B RR pump FCV LVDTs Continue improvements with RR pump FCV
}
RVDTs l
- Tuning of TDRFPs and controls
- Repair EHC leak and test
- A condenser hood manway leak
- Trouble-shoot IRM H/C (Pre-outage)
LaSalle is O
Egggl Unit 2 Outage Scope i
Scope identification
- Reviews /walkdowns complete i
System walkdowns Design Change reviews Work Request Backlog reviews Other Backlog reviews I
- Scope Control Committee i
Similar make-up as Unit 1 Same Restart Screening Criteria used on Unit 1
- Scope accepted by Senior Management LaSalle 19
[
i
3 i
I EEEli Unit 2 Outage Scope l
t' Current Scope includes:
373 Design Change Packages 42 Closed (Ops Authorized) t 48 Awaiting Testing 116 issued for field work l
l 167 To be issued
- 4,174 Preventive Maintenance / Surveillance Tasks
- 1,427 Corrective Maintenance Tasks LaSalle i
20
EEEE Unit 2 Outage Schedule
[
i Schedule scope validation and system turnover punchlist complete j
i System turn-over logic development complete j
i
[
i System out-of-service plan complete i
l Current logic and resource profiles support 100%
power by June 1,1999 LaSalle
~
8 21 l
O EEEE Unit 2 Outage Schedule Status thru 10/15/98 88 Scope Identification 10/98 I/99 Erytineering issue Design Change Packages O
e g
,10/98 Bulk Maintenance & Modifications q
i r v
1/99 Sysicm Testing & Turnovers O
9 Turbine Generator Systems ;79 9
- g79g Modifications & Testing Mode $ witch to O
O-- j si.1.,
Start Dyision Testing Start Core 100% Power Issue Integrated Schedule
$2/99 Reload 5/p/99 l
- ""' I' I 11/4/98 y
4/22/99 y
N N
N N
N l
J\\
/\\
/\\
/\\
/\\
t V
V V
y V
I I
I I
NGG Restart Assessment I
I NRC Inspection l O ^3 weeks O LaSalle 22
1 MM Unit 2 Schedule - Testing Restad
[
1T.ST WINDOW STARTUP WINIX)W 3tDAYS 40 DAYS I
II l
3 4-22 3 16 3
E'I EDG Symem Divison Division ECCS
Response
Vessel &
Checkhst Complete 11 I
Integrated Time Core Drywell Vessel
& Startup Power Testing Testing Testing Testing Reload Reassembly ILRT liydro Preps Ascension Q-O O-O O-O O 0 0 00-00-0-0 00-0 QO O s-l-99 i
DOP Test Window includes: Release OOS System Fall & Vent Integrated System Checklist Surveillances Condenser Mod Testing Post Maintenance Test Vacuwn f
Restart Testmg O
O---
i Division i
Ill l
Testing O
O',
l i
t i
LaSalle l
23 l
EEEE Long Term Improvements -
Station Business Plan Goals -Top quartile performance by 2001 Operational Excellence j
Production Cost l
Identify Gaps i
i
- Perform gap analysis t
Establish Action Plans to Close Gap 1
- Actions
- Monitoring Program j
- Accountabilities LaSalle 24 l
t
l 1
EEEIl Station Business Plan Elements
\\
Operational Excellence
- SCRAM Reduction i
- Radwaste Reduction
- Collective Radiation Exposure Production
- Capacity Factor
- Forced Outages
- Unit Deratings
- Outage Length Reduction
- Non-outage Corrective Maintenance i
1 Cost
- Production Cost / Capital / O & M LaSalle 25 I
i
EMEN Scram Rate Gap Analysis
& Initiatives Scram Rate Goals per 7000 hours0.081 days <br />1.944 hours <br />0.0116 weeks <br />0.00266 months <br /> Scram Rate Gap Analysis 1.2 1.0 1997 Industry Scram Rate = 0.7 a
5 0e E 0.6 05 0.5 0,
a2 e,,
r'
,,,e 2.
LaSalle 26 l
i EEEli Scram Gap Analysis & Initiatives I
Design changes to reduce scram rates Installation of bypass circuit to bypass half-scram j
condition Replace backup overspeed trip test switch with a manual switch LaSalle
~
27 j
EEEIl Summarj General Plant Performance Improving Human Performance Improving Material Condition Improvements continue Planning / Scheduling initiatives Engineering / Technical resolution Operations Leadership drives planning Aggressive L1PC2 Unit 2 Outage challenging but achievable Long-term Improvements driven by Business Plan LaSalle
=
28 t-