ML20196E935

From kanterella
Jump to navigation Jump to search
Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations
ML20196E935
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/22/1988
From: Tilley J
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR16435, RULE-PR-50 53FR16435-01193, 53FR16435-1193, NUDOCS 8807010719
Download: ML20196E935 (1)


Text

DOCKET NUMBER Ilf3 PROPOSED RULE ?S b JUNE 22, 1988 d53 Pg /6 y39 q,g 18 JN 23 P6,.06 OCKEigg' F' J '-[tf F!CE v a

,jCk Secretarv of the Commission Attn! Docketing and Service Branch United States Nuclear Regulatoru Commission Washington D.C.

2055 Subject! Seabrook Licensing

Dear Secretarv of the Commision,

The licensins and operation of the Seabrook Nuclear Power Plant is needed immediateltv. Generation of eletric Power in a clean and safe environment without increasind our dependence upon foreign oil suppliers is reovired now. At Present Seabrook Station is rowerinc the political ambitions of anti-nuclcar Politicians. Mr. Secreterv I reauest that Seabrook Station be allowed to operate and suPP19 New Endland with necesserv electrical Power.

Sincerelv, f

James A.

Tillev RFD 1 BOX 144 l

EPPins, N.H.

03042 l

i 1

1 8807010719 800622-PDR PH SO 53FR16A35 PDR

-/6