ML20196E899

From kanterella
Jump to navigation Jump to search
Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations.Favors Issuance of License to Perform Low Power Testing for Plant
ML20196E899
Person / Time
Site: Seabrook  
Issue date: 06/22/1988
From: Goodridge R
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR16435, RULE-PR-50 53FR16435-00963, 53FR16435-963, NUDOCS 8807010711
Download: ML20196E899 (1)


Text

63 DOMEi!M.39 %

h:UMio RULidhr 53FRJ6 m-c 3 3 23 P1 :56 1988 June 22, YYCKY$

')I ;f-g.

915 A Nu Secretary of the Commission Aten:

Docketing and Service Branch U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir,

I am writing to voice my opinion in f avor of the issuance of a license to perform low powr testing for Seabrook Station.

It is my understanding that concerns are being raised regarding emergency notification systems not being in place for low power testing.

Being an engineer with some knowledge of the design, construction, testing, operation, and quality control of nuclear power facilities, I am 100% confident that Seabrook can be operated safely at low power levels and just as confident that it will be operated safely at full power.

Being a resident of the immediate area with a grave concern that we will soon find ourselves with serious power shortages, I am obligated to urge those who impede the operation of Seabrook to realistically examine the consequences and reconsider their position.

Being an inhabitant of the planet with a genuine fear that our imprudent use of fossil fuels is rapidly leading to the deterioration of our environment, I am compelled to strongly urge those who can expedite the licensing process of Seabrook Station to do so.

We can no longer hold up this process for every unjustified concern its opponents can present because it is absolutely vital that this power be made available now.

To this end, I request that the Commission adopt its proposed clarification of emergency planning requirements for low power licenses.

Sincerely yours, dec Richard H. Goodridge P.O. Box 357 Newfields, NH 03856-0357 1

i l

l 8807010711 000622 PDR PH

)

50 53FR16435 PDR i

i D S -/d I