ML20196E804
| ML20196E804 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/22/1988 |
| From: | Abely D AFFILIATION NOT ASSIGNED |
| To: | NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| FRN-53FR16435, RULE-PR-50 53FR16435-01190, 53FR16435-1190, NUDOCS 8807010694 | |
| Download: ML20196E804 (1) | |
Text
_ _ _ _ _ _ _ -
DOCKET NUMBER Dg '~
gp PR0f0 SED RULE (53 FR IW3D eg;gr llB.AN 23 P6 :05 June 22, 1988 f 3(p,j/p,' ['
f 11 Driftwood Roa BRANCH Hampton, New Hampshire 03842 Secretary of the Commission Attn: Docketing and Service Branch U.S. Nuclear Regulatory Commission Washington, D.C.
20555 w eretary of the Commission:
As a concerned citizen for safe and reliable energy for future generations of New Englanders, I feel compelled to write this letter of support for low power testing of the Seabrook generating station.
I do not support placing a requirement on the Seabrook plant to have a full-scale public notification system in place for low power testing.
Low power testing does not impose a risk to the surrounding habitants or environment and should not be delayed any longer.
I also encourage the NRC to take whatever actions necessary to ensure that Seabrook is licensed (full-power) in a timely fashion.
New England needs the power from Seabrook now!
Please accept my thanks for taking comments on this issue which is so vital to the economy and prosperity of New England!
Sincerely, 1
J dl oc Donald J. Abely g70g6'74 08062D fkb 50 53FR16435 PDR