._
Ctation Support Department i,
l Y
GL 92-01, Rev.1, Supp.1
~
PECO NUCLEAR eem eem --
965 Ctiestertwook Boulevard A Unit of PECO Energy wayne. PA 1908M691 '
1 I
1 l
November 24,1998 Docket Nos. 50-277 50-278 i
License Nos. DPR-44 DPR-56 i
I 1
U. S. Nuclear Regulatory Commission L
ATTN: Document Control Desk 0
Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station, Units 2 and 3 Response to Request for Additional Information concerning Generic Letter 92-01, Revision 1, Supplement 1, " Reactor Vessel Structural Integrity" i
REFERENCES:
- 1) Letter from M. C. Thadani, U. S. Nuclear Regulatory Commission (USNRC), to G. D. Edwards, PECO Energy Company (PECO Energy), dated August 24,1998
- 4) Letter from J. W. Shea (USNRC) to G. A. Hunger, Jr.
(PECO Energy), dated September 25,1996
{
Dear Sir / Madam:
'I
)
This letter is in response to the Reference 1 Request for Additional information I
i i
concerning Generic Letter (GL) 92-01, Revision 1, Supplement 1, " Reactor Vessel Structural Integrity," dated August 24,1998. A response to GL 92-01, Revision 1, Supplement 1, was submitted to the U.S. Nuclear Regulatory rp f
Commission (USNRC) in the Reference 2 and 3 letters. The USNRC review of
\\'k this GL was completed for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 as discussed in your Reference 4 letter.
r 9812040121 981124 M PDR ADOCK 05000277)
P pmg i
040030
November 24,1998 Page 2 As discussed in your Reference 1 Request for Additional Information, the staff is requesting PECO Energy Company (PECO Energy) to reevaluate the Reactor Pressure Vessel (RPV) weld chemistry values that were previously submitted as a part of our response to GL 92-01, Revision 1, Supplement 1, in light of the information presented in the Boiling Water Reactor Vessel and Internals Project (BWRVIP) report,
- Update of Bounding Assessment of BWR/2-6 Reactor l
Pressure Vessel Integrity issues (BWRVIP-46)," EPRI-TR-109727, dated i
December,1997. Attached is our response to your request.
If you have any questions, please contact us.
V ry truly y urs Garrett D. Edwards Director - Licensing Attachment ec:
H. J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC Senior Resident inspector, PBAPS
COhlMONWEALTH OF PENNSYLVANIA:
ss.
COUNTY OF CHESTER Joseph J. Hagan, being first duly swom, deposes and says:
That he is Vice President of PECO Energy Company; that he has read the foregoing letter concerning Generic Letter 92-01, Revision 1, Supplement 1, for Peach Bottom Facility Operating Licenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
Pf=
3 ice Pre ' den Subscribed and swom to before me this I day o
1998.
/
/
c Notary Public NOTARIAL SEAL CAROL A. WALToN, Nowy Put43 A
on r'e y