Text

._

Ctation Support Department i,

l Y

GL 92-01, Rev.1, Supp.1

~

PECO NUCLEAR eem eem --

965 Ctiestertwook Boulevard A Unit of PECO Energy wayne. PA 1908M691 '

1 I

1 l

November 24,1998 Docket Nos. 50-277 50-278 i

License Nos. DPR-44 DPR-56 i

I 1

U. S. Nuclear Regulatory Commission L

ATTN: Document Control Desk 0

Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Response to Request for Additional Information concerning Generic Letter 92-01, Revision 1, Supplement 1, " Reactor Vessel Structural Integrity" i

REFERENCES:

1) Letter from M. C. Thadani, U. S. Nuclear Regulatory Commission (USNRC), to G. D. Edwards, PECO Energy Company (PECO Energy), dated August 24,1998
2) Letter from G. A. Hunger, Jr. (PECO Energy) to USNRC, dated August 15,1995 l
3) Letter from G. A. Hunger, Jr. (PECO Energy) to USNRC, dated November 20,1995
4) Letter from J. W. Shea (USNRC) to G. A. Hunger, Jr.

(PECO Energy), dated September 25,1996

{

Dear Sir / Madam:

'I

)

This letter is in response to the Reference 1 Request for Additional information I

i i

concerning Generic Letter (GL) 92-01, Revision 1, Supplement 1, " Reactor Vessel Structural Integrity," dated August 24,1998. A response to GL 92-01, Revision 1, Supplement 1, was submitted to the U.S. Nuclear Regulatory rp f

Commission (USNRC) in the Reference 2 and 3 letters. The USNRC review of

\\'k this GL was completed for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 as discussed in your Reference 4 letter.

r 9812040121 981124 M PDR ADOCK 05000277)

P pmg i

040030

November 24,1998 Page 2 As discussed in your Reference 1 Request for Additional Information, the staff is requesting PECO Energy Company (PECO Energy) to reevaluate the Reactor Pressure Vessel (RPV) weld chemistry values that were previously submitted as a part of our response to GL 92-01, Revision 1, Supplement 1, in light of the information presented in the Boiling Water Reactor Vessel and Internals Project (BWRVIP) report,

  • Update of Bounding Assessment of BWR/2-6 Reactor l

Pressure Vessel Integrity issues (BWRVIP-46)," EPRI-TR-109727, dated i

December,1997. Attached is our response to your request.

If you have any questions, please contact us.

V ry truly y urs Garrett D. Edwards Director - Licensing Attachment ec:

H. J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC Senior Resident inspector, PBAPS

COhlMONWEALTH OF PENNSYLVANIA:

ss.

COUNTY OF CHESTER Joseph J. Hagan, being first duly swom, deposes and says:

That he is Vice President of PECO Energy Company; that he has read the foregoing letter concerning Generic Letter 92-01, Revision 1, Supplement 1, for Peach Bottom Facility Operating Licenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

Pf=

3 ice Pre ' den Subscribed and swom to before me this I day o

1998.

/

/

c Notary Public NOTARIAL SEAL CAROL A. WALToN, Nowy Put43 A

on r'e y