ML20196D716

From kanterella
Jump to navigation Jump to search

Informs That Attachment 4, Proposed Rev of Min Critical Power Ratio Safety Limit, to Lw Myers Ltr to USNRC Document Control Desk,Will Be Withheld from Public Disclosure Ref 10CFR2.790
ML20196D716
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/24/1998
From: Pickett D
NRC (Affiliation Not Assigned)
To: Myers L
CENTERIOR ENERGY
References
TAC-MA3990, NUDOCS 9812020316
Download: ML20196D716 (6)


Text

.;17

    • 4g ea I

1 UNITED STATES 7p jp B

g NUCLEAR REQULATORY COMMIS810N 4

WASHINGTON, D.C. Sose6 00M November 24, 1998 Mr. Lew W. Myers Vice President - Nuclear, Perry Centerior Service Company P.O. Box 97, A200 Perry, OH 44081

SUBJECT:

REQUEST FOR WITHHOLD!NG INFORMATION FROM PUBLIC DISCLOSURE

- PERRY NUCLEAR POWER PLANT, UNIT NO.1 (TAC NO. MA3990)

Dear Mr. Myers:

I By letter from FirstEnergy dated October 27,1998 (PY-CEl/NRR-2325L), and Generai Electric Company's affidavit, executed by Glen A. Watford, dated September 21,1998, the following proprietary document was submitted: to the letter from Lew W. Myers to USNRC Document Control Desk, Proposed Revision of Minimum Critical Power Ratio Safety Limit, letter number PY-CEl/NRR-2325L, dated October 27,1998. The proprietary text has been enclosed by double brackets.

General Electric Company (GE) requested that the proprietary information be withheld from public disclosure pursuant to 10 CFR 2.790. GE stated that the information should be considered exempt from mandatory public disclosure for the following reasons:

(4)a Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other

/

companies; O

(4)b Information which, if used by a competitor, would reduce his expenditure of resources or /f,[j/

improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

(8)

The information identified [as listed) above, is classified as proprietary because it contains details of GE's Safety Limit MCPR analysis and the corresponding results which GE has applied to Perry's actual core design with GE's fuel.

The development of the methods used in these analysis, along with the testing, development and approval of the supporting critical power correlation was achieved at a significant cost, on the order of several million dollars, to GE.

9812020316 981124 PDR ADOCK 05000440 P

PDR

'h R=

'i

}

L. Myers We have review 9d your submiMal and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of GE's statements, have determined that the submitted information sough? to be withheld contains trade secrets or proprietary commercialinformation.

Therefore, the infornchon marked as proprietary in your submittal of October 27,1998, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concemed to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, or counne, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, v %JLA m -

,0_

Douglas V. Pickett, Senior Project Manager Project Directorate ill-2 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-440 cc: See next page l

n+

1..

i i.

L. Myers November 24, 1998 3

We have reviewed your submittal and the material in accordance with the requirements of 10 0

CFR 2.790 and, on the basis of GE's statements, have determined that the submitted I-information sought to be withheld contains trade secrets or proprietary commerciat information.

Therefore, the information marked as proprietary in your submittal of October 27,1998, will be 4

withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

. Withholding from public inspection shall not affect the right, if any, of persons properly and iirectly concerned to inspect the document. If the need arises, we may tend copies of this information to our consultants working in this area. We will, or course, ensure that the 1

consultants have signed the appropriate agreements for handling proprietary information.

i If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, Original signed by:

Douglas V. Pickett, Senior Project Manager Project Directorate lll-2 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-440 DISTRIBUTION Docket File PUBLIC PDill-3 r/f cc:. See next page SRichards GGrant, Rill EGA1 OGC (email MPS)

DOCUMENT NAME: G:\\ PERRY \\PER96931.PRP

  • See Previous Concurrence To receive a copy of this document, indicate in the box:

"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy 0FFICE PM:PDIIJ-b C

LA:PDIII-2.

C OGC C

D:PDIII-2 N,

BC:SRXB d

NAME DPicketP '

EBarnhill & &-

MPSiemien frPP SRichards 9f*TCollir@

DATE 11/Q/98 11/65I/98 11/S/98 11/ G/98 11/zy/98

'I 0FFICIAL RECORD COPY Jl39

-_.~._m....m,

,s.

4 4

j 1.. Myers November 24, 1998 4

I i

We have reviewed your submittal and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of GE's statements,'have determined that the submitted i

information sought to be withheld contains trade secrets or proprietary commercial information.

Therefore, the information marked as proprietary in your submittal of October 27,1998, will be

]

withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concemed to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, or course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, Original signed by:

Douglas V. Pickett, Senior Project Manager Project Directorate Ill-2 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-440 DISTRIBUTION SDochetPile, PUBLIC PDill-3 r/f cc: See next page SRichards GGrant, Rlli EGA1 OGC (email MPS)

DOCUMENT NAME: G:\\ PERRY \\PER96931.PRP

  • See Previous Concurrence To riceive e copy of this document, indicate in the box: *C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy 0FFICE PM: PDII_I-b C

LA:PDlII-2, C

OGC C

D:PDIII-2 N,

BC:SRXB d

NAME DPicket'C '

EBarnhill ffd-MPSiemien DM-SRichards 9fu"TCollir@

DATE 11/tc/98 11/65'/98 11/S/98 11/G/98 11/zy/98 0FFICIAL RECORD COPY Jl33

,1 s'

+

+

L. Myers November 24, 1998 We have reviewed your submittal and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of GE's statements, have determined that the submitted information sought to be withheld contains trade secrets or proprietary commercial information.

Therefore, the information marked as proprietary in your submittal of October 27,1998, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concemed to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, or course, ensure that the consultants have signed the cppropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.

]

Sincerely, Original signed by:

Douglas V. Pickett, Senior Project Manager Project Directorate ill-2 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-440 DISTRIBUTION Docket File PUBLIC PDill-3 r/f cc: See next page SRichards GGrant, Rill EGA1 OGC (email MPS)

DOCUMENT NAME: G:\\ PERRY \\PER96931.PRP

  • See Previous Concurrence To etceive e copy of this document. Indicate in the box: "C" = Cory without enclosures *E" = Copy with enclosures *N" = No copy 0FFICE PM:PDIII-b C

LA:PDIII-2.

C OGC C

D:PDIII-2 N-BC:SRXB d

NAME DPicket'C '

EBarnhillffd-MPSiemien Offd-SRichards GFTCollirWe DATE 11/tc/98 11/65'/98 11/S/98 11/G/98 11/z'//98 0FFICIAL RECORD COPY g33

.,.i.

j L. Myers Perry Nuclear Power Plant, Units 1 and 2 Centerior Service Company cc:

Mary E. O'Reilly James R. Williams FirstEnergy-A290 Chief of Staff 10 Center Road Ohio Emergency Management Agency Perry, OH 44081 2855 West Dublin Granville Road Columbus, OH 43235-7150 Resident inspector's Office U.S. Nuclear Regulatory Commission Mayor, Village of Perry P.O. Box 331 4203 Harper Street Perry, OH 44081-0331 Perry, OH 44081 Regional Administrator, Region 111 Radiological Health Program U.S. Nuclear Regulatory Commission Ohio Department of Health 801 Warrenville Road P.O. Box 118 Lisle, IL 60532-4531 Columbus, OH 43266-0118 Sue Hiatt

- Ohio Environmental Protection OCRE Interim Representative Agency 8275 Munson DERR-Compliance Unit Mentor, OH 44060 ATTN: Mr. Zack A. Clayton P.O. Box 1049 Henry L. Hegrat Columbus, OH 43266-0149 Regulatory Affairs Manager Cleveland Electric illuminating Co.

Chairman Perry Nuclear Power Plant Perry Township Board of Trustees P.O. Box 97, A210 3750 Center Road, Box 65 Peny, OH 44081 Perry, OH 44081 FirstEnergy Corporation State of Ohio Michael Beiting Public Utilities Commission Associate General Counsel East Broad Street 76 S. Main Columbus, OH 43266-0573 Akron, OH 44308 William R. Kanda, Jr., Plant Manager Mayor, Village of North Perry Cleveland Electric illuminating Co.

North Perry Village Hall Perry Nuclear Power Plant 4778 Lockwood Road P.O. Box 97, SB306 North Perry Village, OH 44081 Perry, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009

_m