ML20196D186
| ML20196D186 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 11/21/1988 |
| From: | Sieber J DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20196D189 | List: |
| References | |
| NUDOCS 8812080232 | |
| Download: ML20196D186 (1) | |
Text
- e e (si4y ApAer $tstm
$Ngc=ngccet. PA 150774004 M,0 g3 g43 g;33 November 21, 1988 U. S. Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Steam Generator Tube Inservice Inspection Results Report Gentlement Attached please find the results of the Beaver Valley Unit No. 1 Sixth Refueling Outage Steam Generator Tube Inservice Inspection Report.
This report contains 1.
the number and extent of tubes inspected, 2.
location and percent of wall-thickness penetration for each indication of an imperfection, and 3.
identification of tubes plugged.
This report is being submitted in accordance with plant Technical Specification 4.4.5.5.
If you have any questions, please contact me or members of my staff.
Very truly yours,
[},
gla ; _,
f[J.
D. Siober Vice President Nuclear Group Attachment cc Mr. J.
Beall, Sr. Resident Inspector Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Sr. Project Manager Director, Safety Evaluation & Control (VEPCO) es120SO232 881121 0
ADOCK05hy]4 j(g PDR