ML20196C714
| ML20196C714 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/22/1988 |
| From: | St Laurent J AFFILIATION NOT ASSIGNED |
| To: | NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| FRN-53FR16435, RULE-PR-50 53FR16435-00909, 53FR16435-909, NUDOCS 8807010202 | |
| Download: ML20196C714 (1) | |
Text
..
DOCKET NUMBER PROPOSED ULE 3p So I,C. i.n.,i i i. '
33PR /to V33)'
'E J.N 23 P 1 :52 146 Exeter Road Hampton, NH 03842 0FFra.. :..
t-c June 22, 1988 00CKElilm N fi vir.i.
BRANvi Secretary of the Commission U. S. Nuclear Regulatory Commission Wasington, DC 20555 Attention:
Docketing and Service Branch
Dear Sir:
I am writing to urge the NRC to adopt the proposed "Interpretive Rule" which would clarify the requirements which must be met before a nuclear power plant is granted a license to perform low power testing.
l As'a New Hampshire resident, I strongly feel that New England l
desperately needs the power which Seabrook Station would generate.
Controversy over Seabrook's emergency plan has gone on for much too long l
and has resulted in tbs needless waste of billions of dollars. Please I
proceed with the prop sed rule and the licensing of Seabrook Station.
Sincerely, Judy St. Laurent l
l l
ON l
eso701,j202 ga 33eniu4ae 05 -lo 1
--