ML20196C656

From kanterella
Jump to navigation Jump to search
Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations
ML20196C656
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/21/1988
From: Barr D
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR16435, RULE-PR-50 53FR16435-00906, 53FR16435-906, NUDOCS 8807010182
Download: ML20196C656 (1)


Text

00C:?.EII!UMGEIl )3 P!:.T f, L Ad d i 80 s

h 3 F R /4 Y S.,..

C i.L u i

..y June 21, 1988 88 JN 23 P1 :52 Secretary of the Commiecion Attn: Docketing and Service Branch U.S. Nuclear Eegulatory Commission 0F'h.

Waehington, DC 20555 00Cxila.,,,.;, m Pu!u -

Dear Sir or Madam:

Ae a reeident of Stratham, New Hampehire, a town about eight milee from the Seabrook Nuclear Power Plant, I am very aware o:! the continual delays and resulting cost increases accociated with the Seabrook project. I am aleo aware of the rapidly increaeing demand for electrical power in New Hampshire and the reet of New England.

I feel that Seabrook Station hae been eafely built and chould be allowed to conduct low-power teetc and then becin full operation ac coon as poeciole. To that end I endoree the propoced NBC rule clarification that would a310w Seabrook to begin its testinc immediately, rather than have that teetinc delayed until a full public notification system ie in place.

I aleo encourage the NEC commiecionere to keep the full-power liceneing procese movine quickly co that Seabrook Station can begin ite operation ne a cafe and reliable eneray cource for New England.

Thank you for veur concideration of thic matter Sincerely,

\\

(

j.._

David F.

Esrr

? Orchard Hill Road Stratham. New Hampehire 03885 l