(),ME$DMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1
l 3 REQUlst TION / URCHASE REQ. NO.
S. PROJECT NO. (lf applicable)
P
- 2. AMENOMEN*./MOOtFICATION NO.
- 3. EF F ECT4VE DAT E 4
Five (5) 2/23/88 RES RFPA dated 8/25/87
- e. isSuEO uv
- 7. ADMINISTERED BV glf other then item 6)
CODEI U.S. Nuclear Regulatory Commission Division of Contracts Washington, D.C. 20555 i
EtTAML AND ADOHESS OF CON T R AC TOR (No., street, county. State end 2/f' Code) y}
9A. AMENOMCNT OF SOLICIT ATION NO.
PRIME:
U.S. Small Business Administration 1020 Main Street - Suite 290
'*- ^ ' * * " " " '
Boise, Idaho 83702
'C
"'"^CU
^ O. ' ' ' C ^ ' '
2 SUB:
Scientech, Inc.
P.O. Box 1406 SB-08710203 (Formerly HRC i
Idaho Falls, Idaho 83403-1406 X
NRC-04-87-397 OLR7-n?7) lots. O AT ED (SEE ITEM 13)
CODE lF ACILITY CODE 3/2/87
- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numCWed schCitation is amended as set forth in item 14. The hour and date specifisJ f or receipt of Of fers is en tended, is not eu ten &c.
Of fers must actnowledge receipt of this amendment prior to the hour and date specified in tne solicitation or as amended.by one of tne following methods:
(a)By amsetra items 8 and 15. and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the of fer
[
submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. F AILURE OF YOUR ACKNOWLEDG-MENT TO BE RECEIVED AT THE PLACE DEslGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE sPECIFIED MAY RESULT IN REJECTION OF YOUR OF FER. If by virtue of this amendment you desire to change an of fer stready submitted, such change rnay be rnade by telegram or le.ter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
. ACCOUNTING AND APPROPRtATION DAT A (1/ requsred)
BF.R No. 601950 FIN No. D-1760 Amount $97.66R 90
- 13. THIS ITEM APPLIES ONLY TO MOOlFICATIONS OF CONTRACTS / ORDERS, IT MODI.~lES THE CONTR ACT/ ORDER NO. AS DESCRIBED IN ITEM 14 A. THIS CHANGE ORDE R IS ISSUED PURSUANT TO: ISpecify authonty) THE CHANGES SET FORTH IN 6T EM la ARE MADE IN THE CON-g TR ACT ORDER NO. IN ITEM loa.
B. THE ABOVE NUMBEREO CONTR ACT/ ORDER 15 MOOlFIED TO REFLECT THE ADMINISTR ATIVE CHANGES (ruch e. changes in paying off6ce, approprsatson date. etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITV OF FAR 43.303(c).
C. THt$ SUPPLEMENT AL AGREEMENT IS ENT EREO INTO PUR5UANT TO AUTHORITY oft X
FAR Clause 52. 243-1 "Chancies" O. 01ME R ISpecsfy type of rnodifseatson and authorsty) b is not.
X is required to sign this document and return __2 Copie$ to the issuing Of fiCe E. IMPO RT ANT: Con tractor is. OESC R witON OF AMLHOMLN TtMOOsFsC AT TON tortansted 61 UCF secreon headants. meludsne sohcstatsantcon tract eubject matter where feasable.)
i The purpose of this modification is to incorporate additional tasks which fall within the existing contract scope, provide additional funds accordingly and change the l
due date for the required Final Regulatory Analysis Report.
Now, therefore, the l
following changes are hereby made:
E.um u um.co m..n..n i.,ms.no coao.w i e m. accumeni.ev..nc.a in nem S A o, n o A.., n.,em,. o.m.o..m..n. onen.na.a.no m von io ce e
.s M e' f e. G t i',4~ N AME AN O lif LE Or SIGNE R IT ype or pono If3A. N AME AND TIT LE OF CON f R4CTING Di FtCL H (Type or pennt) 080609 (See Signature Page) mi~ 99063 h ppg
.,c. O m stG N L O 1R UNIT E O ST AT E5 0F WUUC A l16C, D A TE MGNLO N..R..C ~00 397 PDR I'
M
-.skguture of Cnntmetent Othcer) a tu < n! p<rnan a uthoraed to sein)
NSN /$40-01 152 s o70 30 105 ST ANDARD FORM 30 (REV.10.e3)
PREVIOUS E DtT ION UNUS ABLE Presceir ed by GS A FAH(40CFA)93743
t Modification No. 5 Contract No. NRC-04-87-397 (Formerly NRC-03-87-027)
Page 2 of 3 1.
The contractor's proposal of December 28, 1987 and subcontractor's proposal of February 1988, for the performance of additional tasks as described in the attached statement of work, are hereby accepted and incorported by reference.
As a result, Section C.1, Description /
Specifications / Work Statement is modified to include the additional tasks identified in the attached Statgmegt of Work.
2.
Section B.1 Consideration and Obligation is revised by increasing the total ceiling amount of the contract by 197,568.00 from $85,732.00 to $183,300.00. Of the total ceiling amount $33,930.00 represents the Fixed Prire for performance of the basic contract effort, 15,425.00 represents the ceiling for performance of sdditional Support, as required, per Section C, Task number 8 of the contract, 12,592.00 represents the ceiling for Travel associated with performance of Task numbar 8,
$43,785.00 represents the cost ceiling (i nc l usi ve of fixed fee) for performance of odditional tasks 1 through 5 (added to the contract under Modification No.
3), and $97,568.00 represents the cost ceiling for performance of additional tasks (added to the contract under.his Modification No. 5), of which 190,341.00 represents total estimated reimbursable cost and $7,227.00 represents the fixed fee.
3.
Section D.1, Consideration and Obligation is revised by changing the due date for the "Final Regulatory Analysis Report" to December 71, 1988.
4 Section F.
4 Duration of Contract Period, is revised by the expiration date of the contract to December 31 1908.
)
1 All other terms and condittons remain un-hanged.
q Modification No. 5 Contract No. NRC-04-07-397 (Former1y NRC-03-87-027)
Page 3 of 3 IBIE6BIIIE GGBEEMENI SUBCONTRACTOR:
Scientech, Inc.
_b
_hiu__,,L1. Receis u._ _ _hk_ _
_ gff h Date:
i By:
t 1
___(;__
.__ b Rg._qp__Q Q _O_____
l Name:
Tit 1e:
___@_@_Q@_l_,_Q R Q_T ____________
PRIME CONTRACTOR U.
S.
Small Dupiness Administration By:
.-;I
,ji/N
] Iv Date: ____/
__I8lhl)[djid_ _M.hf Name:
Contracting. Officer / SBA
Title:
PROCURING OFFICE U.S.
Nuc1 ear Requiatorv Commission
__[
/
Dv:
[
It.I Date: __
_ _ _ _ E{0}$][ igg [d, _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _
Name:
Contacting Officer
Title:
o y
o l
l I
STATEMEllT OF WORK The contractor will perform the following additional tasks:
1.
Evaluate existing plant-specific PRA's using seal failure probability-leakage model obtained from flVREG/CR-4906P (AECL) to determine the core melt frequency resulting from station blackout.
The plant specific PRA's selected should be representative of the high, middle and low cluster plants as given by fiUREG-1032 for fregaency of station blackout duration, f ig. B 7.
PRA's selected should represent Westinghouse plants since the seal leakage model (fiUREG/CR-4906P) to be used represents a Westinghouse RCP seal. Modify cristing PRA's to incorporate AECL seal model assuming both existing 0-ring and improved 0-ring material. Characterize the core nelt frequency for these plants as a function of time for both cases.
2.
For the same plant specific PRA's, characterize the core melt frequency as a function of time assuming an emergency station blackout seal cooling system wi th various reliabili ties (i.e., R=0.9 to 0.99).
3.
The contractor will submit a draf t letter report sumarizing results of these additional tasks for tiRC review and comment.
4.
The finalized results shall be incorporated by the contractor in the Regulatory Analysis Report to justify the core melt frequency averted by g
an emergency seal cooling system for station blackout.
Level of Effort The estimated level of effort for performance of required tasks is four (4) man months. The evaluation of three (3) PPA's is anticipated.
Schedule / Deliverables The cuatractor shall provide the !!RC with Final Report by Dec er.be r 31, 196S.
Period of Perfornance The pe r iod o f pe r f o r:..ince fo r the quir.o.tfor;_ i. Februiry 21 1"O
- Le u,