ML20196B592

From kanterella
Jump to navigation Jump to search
Summary of 980928-1001 Performance Assessment Process Improvement Public Workshop to Solicit Feedback from Industry & Public on Development of Improvements to Regulatory Oversight Processes for Commercial NPPs
ML20196B592
Person / Time
Issue date: 11/16/1998
From: Frye T
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
Shared Package
ML20196B598 List:
References
NUDOCS 9812010143
Download: ML20196B592 (2)


Text

...

tY Kito p

s UNITED STATES g

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2056tKm01 49*****

,o November 16, 1998 MEMORANDUM TO:

File FROM:

Timothy J. Frye, Reactor Operations Engineer Y Inspection Program Branch Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF THE SEPTEMBER 28 TO OCTOBER 1,1998, PERFORMANCE ASSESSMENT PROCESS IMPROVEMENT PUBLIC WORKSHOP A four day public workshop was held from September 28 to October 1,1998, by the NRC to solicit feedback from the industry and public on the development of improvements to the regulatory oversight processes for commercial nuclear power plants. The results of the workshop are provided as attachment 1. A list of workshop attendees is provided as attachment 2 and the background material used during the workshop is provided as attachment 3.

The results of the workshop as described in attachment 1 will be used by the NRC in the continued development of improvements to the regulatory oversight processes.

Attachments: 1.

Results of the NRC's Performance Assessment Public Workshop 2.

List of Workshop Attendees 3.

Performance Assessment Public Workshop Background Material e

I l

i TT B 3 l\\

  • ?,

,. s O'I p)

)

ho 43 16 PDR

l November 16, 1998 l

MEMORANDUM TO:

File i

FROM:

Timothy J. Frye, Reactor Operations Engineer Inspection Program Branch Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF THE SEPTEMBER 28 TO OCTOBER 1,1998, PERFORMANCE ASSESSMENT PROCESS IMPROVEMENT PUBLIC WORKSHOP A four day public workshop was held from September 28 to October 1,1998, by the NRC to solicit feedback from the industry and public on the development of improvements to the regulatory oversight processes for commercial nuclear power plants. The results of the workshop are provided as attachment 1. A list of workshop attendees is provided as attachment 2 and the background material used during the workshop is provided as attachment 3.

The results of the workshop as described in attachment 1 will be used by the NRC in the l

continued development of improvements to the regulatory oversight processes.

Attachments: 1.

Results of the NRC's Performance Assessment Public Workshop 2.

List of Workshop Attendees 3.

Perlormance Assessment Public Workshop Background Material DISTRIBUTION:

PUBLIC Central Files PIPB R/F l

DOCUMENT NAME: MTG0928. SUM l

To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy l

OFFICE PIPB: DISP 6

PIPB: DISP l

l l

NAME TJFrye T5s:

MRJohnson

,DATE 11 //u98 ll /Kpf98 OFFICIAL RECORD COPY

!