Suppl 1 to 970602 Application for Amends to Licenses DPR-33, DPR-52 & DPR-68,allowing Continued Plant Operation with Single Recirculation Loop in Svc
ML20196A949
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 11/19/1998
From: Abney T
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18039A614 List:
References
TVA-BFN-TS-387S, NUDOCS 9811300201
Download: ML20196A949 (6)


Text

. . ._

1 l

b l

Hl4 Tennessee Valley Authority, Post office Box 2000, Decatur, Alabarra 35609-2000 November 19, 1998 TVA-BFN-TS-387S1 10 CFR 50.4 l 10 CFR 50.90 10 CFR 50.91 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk l

Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, AND 3 -

TECHNICAL SPECIFICATIONS (TS) CHANGE 387 - SINGLE RECIRCULATION LOOP OPERATION (SLO) - SUPPLEMENT 1 In accordance with the provisions of 10 CFR 50.4 and 50.90, ,

on June 2, 1997, TVA submitted a request for a TS amendment (TS-387) to licenses DPR-33, DPR-52, and DPR-68 to allow continued plant operation with a single recirculation loop in service. This supplement is being provided to update the previous TS submittal to account for subsequent NRC approved changes to the TS and to discuss subsequent changes to SLO analyses.

Specifically, the Power Range Neutron Monitor System (PRNM)

Upgrade with implementation of Average Power Range Monitor i (APRM) and Rod Block Monitor (RBM) TS (ARTS) improvements, and Maximum Extended Load Line Limit (MELLL) analyses have )

been incorporated in Units 2 and 3 TS. The associated TS i changes were approved by NRC for Unit 2 in Amendment 253 on

July 14, 1998, and for Unit 3 in Amendment 213 on

! September 3, 1998. These changes eliminate the flow biased l RBM function previously referenced in TS 3.4.1 in proposed TS-387. PRNM/ ARTS implementation also changed the SLO APRM }

l }

< l

$k1 SONk jOk

=

O e

U.S. Nuclear Regulatory Commission Page 2 November 19, 1998 i

Flow Biased Simulated Thermal Power - High, equation in TS Table 3.3.1.1-1. Additionally, on Units 2 and 3, Power Uprate TS were approved as Amendments 254 and 214 respectively on September 8, 1998. The Power Uprate amendment also affects the APRM Flow Biased Simulated Thermal Power - High, equation in TS Table 3.3.1.1-1 proposed in TS-387. Power Uprate TS are implemented on Unit 3 and will be implemented on Unit 2 in Spring 1999.

Subsequent to the original submittal of TS-38,, the SAFER /GESTR Loss-of-Coolant Accident (LOCA) analysis referenced in the TS-387 submittal has been updated and reissued as NEDC-32484P, Revision 2, December 1997. This document was submitted to NRC on July 24, 1998. In addition, a more conservative LOCA analysis methodology for SLO has been implemented recently for Unit 3. Refer to Enclosure 2 for more detail on the current approach for Unit 3.

To assist NRC in the review of TS-387, the changes needed for >

SLO marked-up against currently approved TS and TS Bases pages are provided in Enclosure 1. These changes are simply the result of accounting for the TS/ reference changes made subsequent to the original submittal of TS-387. The inserts from the original TS-387 submittal are included in the mark-ups to better show the changes. For completeness, all of the TS-387 TS/ Bases changes are being resubmitted. For pages which have not been changed, "no change" is denoted at the bottom of the page.

Note that also included in Enclosure 1 are Unit 2 pages 3.3-7 {

and B 3.4-5 marked-up against both the current TS pages and the NRC approved (Amendment 254) Power Uprate TS. If the SLO ,

TS is approved and implemented prior to Power Uprate i I

implementation on Unit 2 (Spring 1999) , then the current TS mark-up change will be incorporated into the Unit 2 TS pending implementation of the Power Uprate TS on Unit 2.

Since Unit 3 has already implemented Power Uprate TS, the current TS mark-up pages are already Power Uprate pages so no i further changes are needed.

In Enclosure 2, additional detail is provided for the reasons i for the TS/TS Bases changes. Also, included in Enclosure 2

U.S. Nuclear Regulatory Commission Page 3 November 19, 1998 is an update to the TS-387 submittal package which highlights changes to supporting analyses made since the original submittal of TS-387.

In TS-387, proposed changes for SLO were provided in both custom TS format and Improved TS format. Since BFN has since  ;

converted to Improved TS, the changes in custom format are no longer pertinent and should be considered as withdrawn by

)

this letter.

1 This supplement to TS-387 does not af fect TVA's conclusion l that there are no significant hazards considerations associated with the proposed changes and that the TS change qualifies for a categorical exclusion from environmental review pursuant to the provisions of 10 CFR 51.22 (c) (9) .

Additionally, in accordance with 10 CFR 50.91 (b) (1), TVA is sending a copy of this letter and enclosures to the Alabama State Department of Public Health.

l A high priority is requested for the review of this TS to avoid potential reactor shutdowns in the event of an  ;

unexpected recirculation system problem.

If you have any questions about this supplement, please contact me at (256) 729-2636.

S pcerely, T. .E. Abney Manager of L' ns.ng and Indus ry Af f- irs Subscribed d sworn to before me on is 19th ay of November 1998.

44U . d41 Notary Public l

My Commission Expires kM2[jdO2,

[ /

Enclosures cc: see page 4

U.S. Nuclear Regulatory Commission Page 4 November 19, 1998 Enclosures cc (Enclosures):

Chairman Limestone County Commission 310 West Washington Street Athens, Alabama 35611 Mr. Harold O. Christensen, Branch Chief U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street, S. W.

Suite 23T85 Atlanta, Georgia 30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 L. Raghavan, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 St2ta Health Officer Alabama Department of Public Health 434 Monroe Street-Montgomery, Alabama 36130-1701

l I

Y 6 ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY ,

BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2, AND 3 PROPOSED TECHNICAL SPECIFICATIONS (TS) CHANGE TS-387 SINGLE LOOP OPERATION (SLO) I SUPPLEMENT 1 MARKED-UP PAGES

(

l l

Below is a listing of the affected TS/ Bases pages required for SLO (TS-387) marked-up against the currently approved and implemented Units 1, 2, and 3 TS/ Bases pages except as noted. ,

The original insert pages from TS-387 are marked-up to better l show the differences due to subsequent TS/ Bases changes as discussed in Enclosure 2.

AFFECTED PAGE LIST Unit 1 Unit 2 Unit 3 2.0-1 2.0-1 2.0-1 3.3-6 3.3-7(Current TS) 3.3-7 3.4-1 3.3-7 (Uprate TS) 3.4-1 l B 3.2-2 3.4-1 B 3.2-3 B 3.2-5 B 3.2-3 B 3.2-5' B 3.2-7 B 3.2-5 B 3.2-6 B 3.2-10 B 3.2-6 B 3.2-11 B 3.4-4 B 3.2-11 B 3.4-4 B 3.4-5 B 3.4-4 B 3.4-5 B 3.4-7 B 3.4-5(Current TS) B 3.4-7 B 3.4-10 B 3.4-5(Uprate TS) B 3.4-10 B 3.4-14 B 3.4-7 B 3.4-14 l B 3.4-10 B 3.4-14 MARKED-UP PAGES

See attached I

l.

L

Unit 1 TS 6

O